Arlington County Electric Vehicle Infrastructure
Bowman is providing engineering design services for the electrical systems at eleven County facilities. Scope of work includes evaluation of existing electrical infrastructure at each facility, recommendations report for the installation of Level 2 and Level 3 EV charging stations, and preparation of permit-ready drawings for installation.