Federal Aviation Administration, ATCT Life Safety Assessments

Posted on October 4th, 2023 by Renee Narvaez

At over 65 locations throughout the eastern United States, our team designed modifications to air traffic control towers’ (ATCT) fire and life safety systems in order to comply with new OSHA standards and FAA criteria.

Air Traffic Control Tower, Piedmont Triad International Airport

Posted on October 3rd, 2023 by Renee Narvaez

The Federal Aviation Administration (FAA), Eastern Services Area was constructing a new air traffic control tower and base building at the Piedmont Triad International Airport (GSO) in Greensboro, North Carolina. Our team provided BIM-level fire protection and fire alarm system design services and life safety analysis.

Bordentown Hotel and Car Wash

Posted on September 29th, 2023 by Jillian Taylor

Our team was retained to perform traffic engineering and highway design services in support of the 128-room, four-story hotel and car wash facility along US Route 206 in Bordentown Township. We prepared the project traffic impact study, highway access permit plans in support of site plan approval by the Township and Access Permit approval by NJDOT.

Audubon Crossings Highway Design

Posted on September 29th, 2023 by Renee Narvaez

Our firm provided engineering design services for highway and traffic signal improvements associated with the Black Horse Pike Shopping Center. We designed improvement plans for the roadway and site access in accordance with NJDOT’s Highway Access Permit (HAP) process.

Aquetong Spring Park Project

Posted on September 29th, 2023 by Renee Narvaez

This project included a 10’ wide bituminous asphalt shared-use path beginning at a proposed parking lot adjacent to the reconfigured Judy House driveway access along Lower Mountain Road. The path extends north along Lower Mountain Road before turning to generally follow Lower York Road (SR 0202) eastbound.

Interstate 78, SR 501 Interchange Improvement

Posted on September 28th, 2023 by Renee Narvaez

Our firm was retained to provide transportation engineering services for this interchange improvement project. Our team had previously completed a Transportation Impact Fee Roadway Sufficiency Analysis and Capital Improvement Plan for Bethel Township.

Walk Phoenixville | Pedestrian Walkability & Accessibility Plan

Posted on September 28th, 2023 by Renee Narvaez

The team conducted a comprehensive evaluation to assess pedestrian accommodations throughout the entire borough. This evaluation led to the development of a pedestrian walkability and accessibility plan to address necessary policy changes, maintenance and operational issues and needed capital improvements.

Downtown Princeton Parking Study

Posted on September 28th, 2023 by Renee Narvaez

Our firm assisted the project team with the completion of a comprehensive study in the Municipality of Princeton to evaluate existing parking deficiencies and solutions. Our primary role was the GIS-based data collection that included a thorough inventory and parking utilization counts within the bustling downtown.

Page Field (FMY) General Aviation Terminal

Posted on September 27th, 2023 by Jillian Taylor

The complex consists of a 22,000 sq. ft. terminal building, 24,000 sq. ft. bulk hangar, parallel taxiways to two runways, new 600,000 sq. ft. apron along with landside improvements including a new access road and vehicular parking. The project also included utilities, lighting, landscaping, signage and a new fuel farm.

Miromar Outlets

Posted on September 27th, 2023 by Jillian Taylor

Miromar Outlets is situated on a 75-acre parcel located north of Corkscrew Road, between I-75 and Ben Hill Griffin Parkway. The project is a portion of the Timberland and Tiburon DRI, and is zoned CPD with 700,000 sg. ft. of building area approved. Miromar Outlets features more than 140 top designers and brand name outlets, plus restaurants, banks, a gas station and the main offices for Miromar Development Corporation.