VDOT Safety Rest Area Support Services

Posted on September 15th, 2020 by Renee Narvaez

This project involved the engineering/condition assessment of VDOT’s Safety Rest Areas water and wastewater facilities, totaling 21 different facilities throughout the Commonwealth.

Terminal 5 – M Fuel Extension Fuel Package at O’Hare Airport

Posted on September 15th, 2020 by Renee Narvaez

Bowman is providing resident engineering services for this fuel loop being constructed in advance of the new International Terminal (T5) Building expansion.

The Hamptons at Celebrate Virginia

Posted on September 15th, 2020 by Renee Narvaez

The development consists of 384 apartments, with a mix of 60% 2-bedrooms, 25% 1-bedroom and 15% 3-bedrooms. This site also proposes a community building/clubhouse/ pool and four (4) acres of commercial which is planned as a 100 room (4 Story) hotel and a 27,000 sq. ft. office building.

The Mall at Short Hills

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning and civil design to design the 50,000 sq. ft. expansion of a high-end existing mall and parking structure. Design services included rerouting of existing utilities to accommodate the new parking deck, layout of a new restaurant pad site and integration of deck expansion to the existing site facilities.

The Metropolitan at 40 Park

Posted on September 15th, 2020 by Renee Narvaez

n of a smart growth redevelopment project in downtown Morristown. This site includes a 40,000 sq. ft. of street level retail with 84 luxury condominium units and a new luxury apartment building above the ground floor. Below everything is a 700 car parking garage and a Gold LEED Certified 25,000 sq. ft. office and an apartment building with 36 loft type units are also part of the project.

Safer Access Road Mapping

Posted on September 15th, 2020 by Renee Narvaez

Bowman worked closely with our client to deliver detailed laser mapping serviced with our unmanned surveying drone. The project site was a multi-mile thoroughfare of extreme terrain that is mostly inaccessible by traditional survey techniques. Additionally, the client was about to utilize drone footage for a company-wide marketing campaign about site operations.

U.S. Naval Academy Hammer Throw Field Improvements

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying, civil engineering, site and landscape plans, and a forest conservation plan for this project at the U.S. Naval Academy in Anne Arundel County, Maryland. Bowman’s scope of services included regrading and providing swales around the hammer throw fields to provide stormwater management through swale infiltration.

Trace

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided professional environmental, engineering, and surveying services for this 420-acre residential, commercial and retail development, including preliminary design, site control, boundary surveys, utility system layout, preliminary design of storm water facilities, and final subdivision design for roadways and residential lots.

UT Tennis Center, UTGC Recreational Swim Center, and TWC Residential Casitas

Posted on September 15th, 2020 by Renee Narvaez

This mixed-use project includes a tennis center with six indoor courts and four outdoor courts for University of Texas Athletics, a recreational swimming facility and concession building for The University of Texas Golf Club, and 20 residential “casitas” (condominiums). Bowman refined the land plan, designed the shared on-site and off-site infrastructure, and managed the site plan approval process.

Tyco Simplex Grinnell Commercial Facilities

Posted on September 15th, 2020 by Renee Narvaez

Bowman performed laser scanning services to observe existing interior conditions of 24 facilities of a world-wide commercial company. The facilities were located throughout the regions of Michigan, Ohio, Illinois, Wisconsin, Indiana, Kentucky and Pennsylvania.