Arlington Public Schools On-Call
Bowman was contracted to provide civil engineering services to support the investigation and feasibility of expanding various existing schools in Arlington County.
Bowman was contracted to provide civil engineering services to support the investigation and feasibility of expanding various existing schools in Arlington County.
Bowman provided planning and preliminary design services for a 158-lot single family residential subdivision on a 40 acre site. Bowman provided land planning and entitlement services including PAD, General Plan Amendment and Preliminary Design documents. The team also worked closely with City planning officials to incorporate future infrastructure expansions into the project’s design.
Bowman has partnered with Southern Land Company to provide civil engineering and survey services for the development of the Society at Laurens – a luxury, mid-rise apartment community with 148 apartment units located in Charleston, South Carolina, The community will also include a resort style pool, lounge, fitness center, and business center.
Phase II design engineering services for the widening and resurfacing of 1.75 miles of 55th Street to address safety and operational needs and to provide expanded pedestrian. The closed drainage sys-tem will be upgraded with new trunk sewers and drainage structures and includes the extension of a 4’x4’ box culvert.
Phase I Engineering Services to evaluate four intersections to identify improvements that will address the accident history, increase the safety of the intersections, and create continuity throughout the corridor while minimizing impacts to the operational characteristics of the intersections. Includes Intersection Design Studies, Drainage Technical Memo and preparation of a Project Development Report for 75th Street.
Bowman was responsible for the land planning feasibility and commission permit legislative process, landscape architecture, arboriculture, civil engineering, environmental, and surveying services for Loudoun’s 320,000 sq. ft. premier STEM education facility combining the Academies of Science, Monroe Advanced Technical Academy, and the Academy of Engineering and Technology.
Bowman provided engineering services to evaluate the site readiness and economic development suitability of nine properties located within the County-designated growth area to evaluate their po-tential for economic development and the value that Bowman can create through the quantification of site development needs such as entitlements, permits, soils, environmental features, surveys and available infrastructure.
Bowman provided its core planning, surveying, and civil design serves to deliver a mixed-used development on 701 acres. The team was challenged to incorporate elements of includes retail, office, multi-family, townhome, and single family uses in a tight and topographically constrained site.
Bowman established the primary geodetic control network consisting of 20 control monuments throughout a 70,000 acre wind farm development in Western Illinois. Bowman used GPS static observations and advanced post-processing adjustments to establish NAD83 horizontal and NGVD88 vertical datum to support the boundary survey and ALTA/ACSM Land Title Survey and future construction stakeout for this wind farm.
Bowman provided various professional services for this 346,400 sq. ft. warehouse and was responsible for the planning and design of stormwater management, storm drain layouts, water and sanitary sew-er alignments, erosion and sediment control staging, permitting, as well as retrofit design for storm-water pond conversion.