Cross Country Elementary and Middle School

Posted on December 15th, 2023 by editor@bowman

Bowman was responsible for the MEP engineering for the new 95,000 sq. ft. state-of-the-art Elementary and Middle School. The new school will have three floors, equipped with cutting-edge science, art and music labs, even several mindfulness and communal spaces. The project was designed to achieve LEED Gold certification.

UMD BioPark 4MLK Building

Posted on December 7th, 2023 by editor@bowman

4MLK is the first of two new gateway buildings to be prominently located at the entrance of the research park. Bowman is responsible for the MEP design services for the first Gateway building, a 266,000 sq. ft. facility. The building is designed LEED Silver and exceeds ASHRAE 90.1-2010 by 20%.

CBRNE APG Command HQ Buildings 5016 & 5046

Posted on July 10th, 2023 by editor@bowman

Bowman provided commissioning services for the 20th CBRNE HQ facility. Design included renovating existing buildings 5016 and 5046, totaling 94,472 sq. ft. and 92,006 sq. ft. to provide a command suite with offices, SCIF, arms room, operations center, conference rooms, file and functions of a standard command and control facility.

The Chesterfield Building – West Village

Posted on July 6th, 2023 by editor@bowman

Bowman provided mechanical, electrical, and plumbing engineering design and energy modeling services for the complete gut and renovation of a historic tobacco factory and warehouse into a LEED Gold certified seven-story, 314,000 sq. ft. office and technology center.

Baltimore Ravens Under Armour Performance Center

Posted on July 6th, 2023 by editor@bowman

Bowman provided mechanical, electrical and plumbing design engineering for the interior renovation of the 113,237 sq. ft. training facility, as well as a 46,000 sq. ft., two-story addition to the Baltimore Raven’s Under Armour Performance Center.

6100 Meriweather Office Building & Parking Garage

Posted on July 5th, 2023 by editor@bowman

The project consisted of the MEP engineering and commissioning for a 300,000 sq. ft. core and shell office building and an above ground parking garage with a capacity of approximately 1,400 vehicles and 30 Level 2 EV charging stations. The garage design included a two-bay fire station for Howard County Fire and Rescue.

Pike and Rose Block 3

Posted on July 5th, 2023 by editor@bowman

Bowman was responsible for the mechanical, electrical and plumbing design for the new 253,000 sq. ft., 10-story LEED Gold certified office building and seven-story parking garage located on Block 3 of the Pike and Rose development in Rockville, Maryland. The building includes 7,000 sq. ft. of shell retail space, a fitness center and conference center.

Brightview Senior Living

Posted on July 3rd, 2023 by Renee Narvaez

Responsible for the mechanical, electrical, plumbing and fire protection design of several new Brightview Senior Living facilities. Projects included a mix of independent living units, assisted living units and memory care units as well as a full suite of amenities.

John Lewis Elementary School

Posted on February 7th, 2023 by editor@bowman

Bowman provided full civil design and construction documents for John Lewis Elementary School. Project included raze of existing building and construction of new school, including site amenities such as athletic field, playground, courts and off-street parking.

Lowe’s Gallery 64

Posted on February 7th, 2023 by Renee Narvaez

Museum Place is a mixed-use redevelopment of a former DC school property in Southwest. Our scope of work included the mechanical and plumbing engineering design for Lowe’s Gallery Place, the new multi-unit residential building including a large ground-level outdoor courtyard, and two levels of underground parking structure.