South Valleys Regional Park

Posted on November 30th, 2023 by Jillian Taylor

Our team was responsible for the design (master planning and construction documents) and project management of an 83-acre park in the Southwest Truckee Meadows. The park incorporated parcels from different property owners. We assisted in the negotiations between the owners and Washoe County for the land dedication.

Reno-Sparks Indian Colony Modular Classroom

Posted on November 30th, 2023 by Jillian Taylor

Our team provided land surveying, mapping, civil design and construction support services for the development of a new 1,400 sq. ft. modular classroom with the Reno-Sparks Indian Colony (RSIC).

Unloading Facility & Metering Station

Posted on November 29th, 2023 by Jillian Taylor

JP Energy Partners planned a crude oil gathering, storage and mainline pump facility located south of Cherokee, OK and a crude oil pipeline metering station at Cushing, OK to serve the new Great Salt Plains 8” Crude Pipeline originating in Cherokee, OK and terminating in Cushing, OK.

Four Roses Bourbon Distillery

Posted on November 28th, 2023 by Christina Nichols

Bowman provided 3-D laser scanning, planning and zoning expertise, landscape architecture, survey, site civil engineering, structural engineering and comprehensive construction administration/observation services.

Running Brook Road Improvement Project

Posted on October 24th, 2023 by Renee Narvaez

As prime consultant, we led a team providing survey, design, bidding support, construction management and inspection of the entire 1-mile length of Running Brook Road. The resurfacing of the entire lengths of two adjacent side streets, Heath Drive and Compton Way, an additional 0.3 miles, were added to the project scope during the design phase.

Long Beach Blvd. Improvement Project

Posted on October 23rd, 2023 by Renee Narvaez

Our team provided construction management, inspection, and labor compliance for the resurfacing of 192,779 sq. ft. of roadway in Lynwood, CA. Other activities included renovating sidewalks, driveway approaches, curbs and gutters and constructing six new bus pads.

Page Field (FMY) General Aviation Terminal

Posted on September 27th, 2023 by Jillian Taylor

The complex consists of a 22,000 sq. ft. terminal building, 24,000 sq. ft. bulk hangar, parallel taxiways to two runways, new 600,000 sq. ft. apron along with landside improvements including a new access road and vehicular parking. The project also included utilities, lighting, landscaping, signage and a new fuel farm.

Miromar Outlets

Posted on September 27th, 2023 by Jillian Taylor

Miromar Outlets is situated on a 75-acre parcel located north of Corkscrew Road, between I-75 and Ben Hill Griffin Parkway. The project is a portion of the Timberland and Tiburon DRI, and is zoned CPD with 700,000 sg. ft. of building area approved. Miromar Outlets features more than 140 top designers and brand name outlets, plus restaurants, banks, a gas station and the main offices for Miromar Development Corporation.

Hydrogeologic Investigation

Posted on August 23rd, 2023 by Jillian Taylor

Bowman geologists were responsible for the implementation of a groundwater investigation relative to a proposed quarry deepening. The work consisted of drilling oversight and logging of approximately 1,000 LF of bedrock borings, installation of bedrock piezometers, stream gauging, photolineament analysis, aquifer testing, and geologic mapping.

Visual Impact Analysis

Posted on August 23rd, 2023 by Jillian Taylor

Bowman evaluated visual impacts to Viewshed for Hooper Garnet Mine Expansion. A digital terrain model was used to create expansion footprint. Topographic mapping was used to predict visual impacts. Mitigation measures and reclamation planning were developed to reduce visual impacts to the community.