Middlesex Regional Water System

Posted on September 15th, 2020 by editor@bowman

Bowman is assisting the Middlesex Water Authority with developing a regional water system in lower Middlesex County. Due to poor groundwater quality in the individual shallow wells throughout the eastern portion of the County, the MWA has sought to develop a regional water system to serve the entire eastern section of the County. This effort […]

Maple Avenue

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning and design services to the Town of Vienna for the Maple Avenue project. Bowman’s scope of services includes approximately a mile of comprehensive streetscape enhancement, pedestrian improvements, significant overhead utility undergrounding, storm drain utility analysis and design, a full topographic and property survey, and comprehensive easement and entitlement services.

Lake Worth Drainage District E-3 Canal Rehab

Posted on September 15th, 2020 by editor@bowman

Bowman provided canal right-of-way mapping and staking services for approximately 20 miles of canals as part of the Lake Worth Drainage District Canal Rehabilitation Program. The project consisted of staking the right-of-way lines along several Lake Worth Drainage District canals.

I-66 Outside the Beltway P3 Project

Posted on September 15th, 2020 by Renee Narvaez

The I-66 “Outside the Beltway” project is a public-private partnership transportation project that includes 22.5 miles of new tolled express lanes, new and improved bus service and transit routes, and new and expanded park and ride lots.

Cadiz to Hopedale Pipeline

Posted on September 15th, 2020 by editor@bowman

Bowman provided its core planning and surveying services to design a complex extension of multiple large pipelines. The project was further challenged by sensitive environmental areas, tight easements, existing infrastructure, and ongoing mining activities.

Bluestone to Sunoco Pipeline

Posted on September 15th, 2020 by editor@bowman

Bowman provided planning, survey, and design services included pipeline and right-of-way design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous interstate highway, road and railroad crossings, creeks and wetlands.

Bickford South Eby Senior Living Facility

Posted on September 15th, 2020 by editor@bowman

Bowman performed due diligence and land use entitlement services for this 60-unit senior living facility including boundary and topographic surveys, due diligence and preliminary engineering, a preliminary traffic assessment, final site plan preparation and construction plans, and land acquisition transaction services, including an ALTA/ACSM Land Title survey, lead and asbestos survey, easement plats, VSMP General Permit and SWPPP, and subdivision platting.