Bowman was retained to provide detailed design of concrete footings and steel pipe supports for this Intermediate Leach System (ILS) which includes two pipelines.
Bowman was retained to provide detailed design of concrete footings and steel pipe supports for this Intermediate Leach System (ILS) which includes two pipelines.
Bowman performed value engineering and design optimization for the phase II design of a leach pad in a canyon with aggressive slopes (~2.5H:1V). The design included liner subgrade, geomembrane and GCL, solution collecting pipe network, and overliner drain rock.
Bowman performed the engineering design and construction quality assurance for multiple stormwater retention dams. The design process included watershed analyses, lithological investigation and interpretation, earthen structure stability analyses, and flow considerations for a 100-year storm event.
This VDOT project includes construction of 55 miles of four-lane divided limited access highway. The project will be tolled with funds used to pay for project costs. The project also includes design of intermediate interchanges at four major crossroads. The project made it to 15% before getting canceled by VDOT.
Bowman provided planning and design services to support a multi-year mixed used area development. The team coordinated the design and submission of multiple interconnected planning packages to construct major public infrastructure and utility projects.
Bowman provided surveying services for six Whole Foods Markets sites across Florida. Bowman prepared a topographic survey to provide the basis for the final array layout. Bowman recorded the dimensions of the roof inside of the parapets; the height of the parapet off of the roof deck every 20 feet or where vertical changes occurred.
Bowman provided pipeline and ROW design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous road and railroad crossings, creeks and wetlands.
The project consisted of establishing secondary control for survey work, performing field run topographic/planimetric surveys on approximately 80-acres, annotating the existing photogrammetry, property corner recovery and location, and storm sewer/drainage as-built preparation and delivery in accordance with VDOT standards.
Bowman provided land planning, surveying, and engineering design services for this mixed-use development located in the Town of Leesburg. Modeled after developments such as Reston Town Center, the project includes a Wegmans supermarket, and a town center like central core that will include a variety of supportive restaurant, retail, and office spaces.
Bowman provided entitlement, design, engineering, and platting services for a 1,709-acre master planned community in Casa Grande, AZ. With the first phase designed and built, Bowman was hired to incorporate revisions to the remaining phases and accommodate adjustments in arterial roadway alignments, and park acreage as required by the City.