LaGrange Winery

Posted on September 15th, 2020 by editor@bowman

Bowman provided planning, surveying, engineering, and environmental services on this project. Scope of work included the development of a site plan with a parking area layout, preparation of a special use permit plan and plat, a boundary survey, an environmental constraints analysis, a perennial flow determination, support of a cultural resource analysis, and a traffic management plan for the site.

Lake Worth Drainage District E-3 Canal Rehab

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided canal right-of-way mapping and staking services for approximately 20 miles of canals as part of the Lake Worth Drainage District Canal Rehabilitation Program. The project consisted of staking the right-of-way lines along several Lake Worth Drainage District canals.

I-66 Outside the Beltway P3 Project

Posted on September 15th, 2020 by Renee Narvaez

The I-66 “Outside the Beltway” project is a public-private partnership transportation project that includes 22.5 miles of new tolled express lanes, new and improved bus service and transit routes, and new and expanded park and ride lots.

Ken Lawrence Stream Valley Trail

Posted on September 15th, 2020 by editor@bowman

Bowman provided full service engineering, environmental, surveying and construction administration for the restoration of 800 lf of degraded stream valley, installation of 1,000 lf of new trails, and a 30 foot long pedestrian bridge crossing, as well as the first two synthetic turf fields in Tysons Virginia.

Hutto YMCA

Posted on September 15th, 2020 by editor@bowman

Bowman provided its core services including planning, layout, surveying, design and coordination, permitting, bidding and construction observation for this 4-acre YMCA facility. In addition, Bowman was tasked with the coordination of all approvals, permitting and platting with the City of Hutto, Williamson County, and the Texas Commission of Environmental Quality (TCEQ).

John Rolfe Pkwy & Ridgefield Pkwy Sidewalk Improvements

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided planning, surveying and civil design services including topographic and route surveys, land records research, easement and right-of-way acquisitions, tree inventory/analysis/management and supplemental landscape plans. Also provided conceptual design development, final construction drawing preparation, cost estimating, bid phase services, construction administration, construction stakeout, as-built surveys and close out reporting.

John Rolfe Square

Posted on September 15th, 2020 by editor@bowman

Bowman provided surveying and platting, civil engineering, traffic signal design, rezoning, public participation, construction plan approvals, and construction administration for an upscale, urban village style, 55+ age single-family neighborhood, community park, extensive landscaping, and amenities. Bowman also facilitated a solution to provide extensive planning and hardscape design amidst existing easements associated with prior roadway plans.

Johnson Ranch North Subdivision

Posted on September 15th, 2020 by editor@bowman

Bowman provided professional engineering and surveying services including preliminary design, site control, utility system layout, site and lot grading, stormwater facility design, preparation of subdivision construction plans and final plats, and construction phase services for this 287-acre commercial and residential development. Bowman also prepared and obtained an Edwards Aquifer Contributing Zone Permit through the Texas Commission on Environmental Quality.

Global Logistics Park

Posted on September 15th, 2020 by editor@bowman

Global Logistics Park is a master-planned distribution park located on the west side of Staten Island, New York. The park will contain nearly 4 million square feet of industrial buildings and related site infrastructure. Bowman provided survey layout services as the Surveyor-of-Record for the entire project.

Grover Road Intersection Improvements

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided support under an active on-call multi-year agreement with the Anne Arundel County Department of Public Works. The project required final engineering and surveying for roadway widening, turn-lane construction and drainage improvements.