Page Field (FMY) General Aviation Terminal

Posted on September 27th, 2023 by Christina Nichols

The complex consists of a 22,000 sq. ft. terminal building, 24,000 sq. ft. bulk hangar, parallel taxiways to two runways, new 600,000 sq. ft. apron along with landside improvements including a new access road and vehicular parking. The project also included utilities, lighting, landscaping, signage and a new fuel farm.

Miromar Outlets

Posted on September 27th, 2023 by Christina Nichols

Miromar Outlets is situated on a 75-acre parcel located north of Corkscrew Road, between I-75 and Ben Hill Griffin Parkway. The project is a portion of the Timberland and Tiburon DRI, and is zoned CPD with 700,000 sq. ft. of building area approved. Miromar Outlets features more than 140 top designers and brand name outlets, plus restaurants, banks, a gas station and the main offices for Miromar Development Corporation.

Gateway Charter Elementary School

Posted on September 27th, 2023 by Jillian Taylor

Gateway Charter School is a member of the Charter Schools USA family of schools. Charter Schools USA is one of the largest providers of charter school management services in the state of Florida. CSUSA manages private and municipal charters for grades Pre-K through 12.

Fiddler’s Creek Residential Community

Posted on September 26th, 2023 by Renee Narvaez

This 6,000 unit residential/golf course community encompasses 3,932 acres located in southern Collier County. Bowman has provided extensive engineering and surveying services and participated in the planning and environmental permitting of this project.

Chico’s

Posted on September 26th, 2023 by Jillian Taylor

Bowman continues to serve Chico’s as their Site Development Engineer as they aggressively grow and expand. The original 27-acre site served the corporation for design, research, marketing and other administrative functions.

Aircraft Maintenance Hangar, Pensacola International Airport

Posted on September 19th, 2023 by Renee Narvaez

The City of Pensacola constructed a new aircraft maintenance hangar of approximately 160,000 sq. ft. and consists of two non-separated hangar bays and associated support spaces. As part of the design team, our fire protection engineers provided fire protection system design services and life safety analysis.

Costco, Boca Congress Center

Posted on September 1st, 2023 by Renee Narvaez

A traffic impact analysis was completed for the proposed amendment. The site included a 144,140 sq. ft. Costco warehouse, as well as a Costco gas station with 12 fueling positions. The amendment includes the addition of eight (8) additional fueling positions.

Cumberland Drive

Posted on September 1st, 2023 by Renee Narvaez

Our team redesigned Cumberland Drive between Military Trail and Village Boulevard to accommodate one-way, separated bicycle lanes using vertical delineators. The project also included design of a roundabout at the Saratoga Road intersection that accommodated separate bicycle and pedestrian crossing treatments. Efforts included agency coordination.

Fort Pickens Pedestrian Pier

Posted on September 15th, 2022 by Renee Narvaez

Our team of experts worked with the Army Corps of Engineers (COE) to perform a controlled topographic survey at Fort Pickens Beach to establish control points for the piles to accommodate the building of a pedestrian pier. The survey was controlled because artifacts had been discovered close to the proposed construction site.

Dunaway Water Treatment Facility

Posted on September 14th, 2022 by Renee Narvaez

Our team of experts provided complete civil engineering and surveying services for design, preparation of construction plans and specifications, and permitting, bidding, and construction inspection and administration of a new Water Treatment Plant and stormwater management pond at the Dunaway well site for ECUA.