Reagan Memorial Tollway (I-88) East West Connector

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided detailed full scope bridge design and construction administration for various reconstruction efforts throughout Illinois. The team worked in tandem with state and local officials to ensure the design and planning process meet all safety and construction standards.

Shermer Road Bridge Improvements

Posted on September 15th, 2020 by Renee Narvaez

Bowman is responsible for Phase I, II and III engineering services to upgrade the existing Shermer Road Bridge to meet current structural, hydraulic and geometric requirements.

Metra/US Route 45 Bridge

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided Phase II engineering design of a two-span steel through girder railroad bridge. The project included modifications to the geometry and configuration of the Metra Southwest Service Line Bridge including raising the bridge profile. The scope of services included the removal and replacement of the railroad bridge over US 45 and a separate pedestrian […]

Lincoln Yards Development

Posted on September 15th, 2020 by Renee Narvaez

Bowman is providing project management services for the design and construction of transportation improvements that will improve safety, operations, and streets in and around the Lincoln Yards Development.

I-290 to I-90/94 (Jane Byrne/Circle Interchange)

Posted on September 15th, 2020 by Amy Talton

CM services for bridge/retaining wall construction, roadway reconstruction, erosion control and protection, utility relocation of storm sewers, water tunnels, special waste excavation, earth excavation and embankment, removal of existing improvements, pavements, marking/signage, lighting, ITS, traffic control and protection, and urban enhancements.

Gas Main Installations and Bridge Support

Posted on September 15th, 2020 by editor@bowman

Bowman provides design engineering services to Peoples Gas, Light and Coke Company (PGL) for PGL’s Accelerated Main Replacement Program (AMRP). These engineering services are for gas main installation and replacement projects the design of permanent bridge supports of existing gas mains at proposed utility crossings, and maintenance of traffic plans for neighborhood projects.

Hinsdale 2015 Reconstruction Program

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core engineering and design services to facilitate the planning and reconstruction and resurfacing of over a mile of public road infrastructure. The team also oversaw the design and replacement of thousands of feet of utility lines. This required coordination of detailed field survey and geotechnical investigations to ensure design accounted for real world constraints.

Chicago Sewer Design Improvements

Posted on September 15th, 2020 by Renee Narvaez

Design engineering services for sewer improvement projects located throughout Chicago. Work includes data collec-tion and initial assessments, coordination of survey and geotechnical engineering, utility coordination, sewer align-ments and profiles, structural design, compliance with IEPA water sewer separation requirements, cross sec-tions/typical sections, traffic control and detours, surface drainage design, OUC submittals and approvals, and permitting.

Block 37 Site Improvements

Posted on September 15th, 2020 by Suede

Bowman provided civil engineering services and preparation of construction documents in conjunction with the de-velopment of a mixed-use retail/entertainment, CTA transit station, office and retail project. The project consisted of approximately 400,000 sq. ft. above-grade retail and entertainment uses housed on four levels and approximately 100,000 sq. ft. of Class A office building housing a new 17-story facility for CBS Broadcasting.

Alexis Wind Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman established the primary geodetic control network consisting of 20 control monuments throughout a 70,000 acre wind farm development in Western Illinois. Bowman used GPS static observations and advanced post-processing adjustments to establish NAD83 horizontal and NGVD88 vertical datum to support the boundary survey and ALTA/ACSM Land Title Survey and future construction stakeout for this wind farm.