County of San Diego Firearms Training Center

Posted on January 12th, 2023 by editor@bowman

Provided professional landscape architecture services for the County of San Diego Sheriff’s Firearms Training Center. Located in Otay Mesa, the Sheriff’s Firearms Training Center provides training and qualifications for our local police, sheriffs, CIA and FBI agents.

The Inn at Sunset Cliffs

Posted on January 11th, 2023 by editor@bowman

Provided professional landscape architecture services for the Inn at Sunset Cliffs. Our landscape architects developed visual marketing tools for the client’s new deck expansion project, which sets directly above the Pacific Ocean. Working with the client, we were able to develop 3D models and renders of working operations during a typical summer day and event day, such as a wedding.

Vallecitos Water District Land Plan

Posted on January 11th, 2023 by Ji Lee

The Vallecitos Water District had surplus land that is highly constrained that they wanted to find the highest and best use of the parcel for. Our landscape architects analyzed and evaluated the property based on access, steep slopes and biological sensitive habitat.

North Terminal Rehabilitation

Posted on December 7th, 2022 by Jillian Taylor

Our marine engineers performed structural analysis of the bulkhead and designed the required rehabilitation of damaged sections of the dock bulkhead. Scope included performing repair design underwater inspection, developing conceptual alternates for the rehabilitation and developing estimated construction cost of each option.

Refinery Waterfront Inspection

Posted on December 7th, 2022 by Jillian Taylor

Retained to conduct routine inspection of Philadelphia Energy Solution’s 3.5 miles of refinery waterfront along the Schuylkill River. The waterfront consisted of nine wharves, 22 steel sheet pile bulkhead sections (approximately 8,000 LF of bulkhead) and six categories of miscellaneous structures.

PBF Logistics Construction Inspection

Posted on December 7th, 2022 by Jillian Taylor

The project involves construction of two mooring dolphins to tie up ships up to 750 ft long (LOA) and other associated construction work. Such construction work starts with the installation of falsework (temporary steel framing) to be able to install production piles at accurate locations and angles in the waterway.

Perth Amboy Dock Renewal & Rehabilitation

Posted on December 7th, 2022 by Jillian Taylor

Retained to perform a thorough underwater inspection of Berths A and B to document the construction and evaluate the current condition of all existing dock structures and design the complete removal and renewal or rehabilitation of Dock A structures in a phased manner.

River Maintenance Dredging

Posted on December 7th, 2022 by Jillian Taylor

Designed, secured permits, and provided bid support and construction management services for the maintenance dredging of sites located on the Arthur Kill River along New Jersey and New York shorelines. Scope of work included pre-dredge surveys, calculating pre-dredge volumes and preparing sediment sampling and analysis plans.

Carteret Dock 1 Renewal

Posted on December 7th, 2022 by Jillian Taylor

Our team was retained to perform an underwater inspection of Dock 1, review the construction and current condition of the existing dock and design the renewal of Dock 1 in a phased manner. Scope of work included developing several alternates for the construction of new breasting and mooring structures with the estimated construction costs.

Eagle Point Dock No. 2 Modifications

Posted on December 6th, 2022 by Jillian Taylor

Retained to perform a repair design underwater inspection, develop feasible options for rehabilitation, secure environmental permits, perform final design and detailing, perform construction inspection and management. Static and dynamic mooring analysis were also performed.