County Road 8 – Bridge over Fraser River

Posted on September 15th, 2020 by Renee Narvaez

Phase I and II services for replacement of existing steel beam bridge at County Road 8 and the Fraser River, originally constructed in 1979. A bridge hydraulic report and scour analysis were prepared for this project. Proposed structure is 47 feet wide with span of 46 feet Prestressed Precast Concrete (PPC) Deck Beams with a 6-inch cast-in-place concrete slab, founded on pile bent abutments.

CTC on Greenway

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, entitlement support, site planning, preliminary and final engineering, and construction support services for this 136 unit single-family rental community on 17.5 acres.

CTC on Marley Park

Posted on September 15th, 2020 by Renee Narvaez

Located in the prestigious Marley Park Community, this 173 unit, 14.7 acre development features two-bedroom or duplex one-bedroom single story homes with high-end amenities and private backyards. Bowman provided planning, entitlement support, site planning, preliminary and final engineering, and construction support services.

CR 266

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided core planning, drainage design, land surveying and environmental services for roadway improvements to an additional 1.9-mile section of CR 266. The team worked closely with local and state officials to ensure planning and ultimate design met growth targets and municipal goals. The team also coordinated with utility companies for the extension and or relocation of service lines.

Crosspoint

Posted on September 15th, 2020 by Renee Narvaez

Bowman was hired to ensure design compliance with previously designed but never constructed plans and coordinate tie-in and access to public infrastructure. In the process, the team optimized the layout to reduce grading requirements and provide a cost savings to the client.

Disaster Recovery Services Great Gorge Golf Course

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided disaster recovery services on behalf of York Risk Services Group to assess the physical and financial damage to Great Gorge Golf Course as a result of Hurricane Irene and Tropical Storm Lee. Bowman services consisted of assessing damage through analysis of on-site mapping before and after conditions and preparing a report and photo documentation of findings.

Connell Solar L’Oreal Headquarters

Posted on September 15th, 2020 by Renee Narvaez

Bowman obtained land use approvals for this LEED Gold Certified headquarters. The project sits on 12.83 acres and included the installation of over 21,000 sq. ft. of rooftop solar panels and 91,000 sq. ft. of parking lot canopy solar panels. Bowman performed initial due diligence research of municipal zoning, site plans, and coordination through the approval process.

Confidential Wash Settlers

Posted on September 15th, 2020 by Renee Narvaez

Bowman, having previously designed the original settlers during another project, designed two new Wash Settlers with related structures, containment, equipment, storage, piping and instrumentation.

Culver’s

Posted on September 15th, 2020 by Renee Narvaez

Bowman currently works with Culver’s to help expand their footprint in Florida and throughout the Southeast market. Bowman’s retail experts work closely with the owners to provide conceptual site planning, site development plans, civil construction documents, site entitlement, permitting and construction management.

Discovery Elementary School

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering, surveying, scanning, and construction administration services to support this new 98,000 sq. ft. elementary school on 25 acres.