County Road 8 – Bridge over Fraser River

Posted on September 15th, 2020 by Renee Narvaez

Phase I and II services for replacement of existing steel beam bridge at County Road 8 and the Fraser River, originally constructed in 1979. A bridge hydraulic report and scour analysis were prepared for this project. Proposed structure is 47 feet wide with span of 46 feet Prestressed Precast Concrete (PPC) Deck Beams with a 6-inch cast-in-place concrete slab, founded on pile bent abutments.

CR 266

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided core planning, drainage design, land surveying and environmental services for roadway improvements to an additional 1.9-mile section of CR 266. The team worked closely with local and state officials to ensure planning and ultimate design met growth targets and municipal goals. The team also coordinated with utility companies for the extension and or relocation of service lines.

Chinese Cultural Center

Posted on September 15th, 2020 by Christina Nichols

Bowman provided professional design and platting services for a 30-acre cultural theme center. The team was responsible for the layout and design of public infrastructure including roads, utilities and underground stormwater retention.

Chicago Sewer Design Improvements

Posted on September 15th, 2020 by Christina Nichols

Bowman staff has provided design engineering services for more than 200 sewer improvements on a task order basis throughout the City of Chicago. Sewer sizes vary from small diameter to 15-ft by 12-ft monolithic concrete sewers.

Claiborne Parkway Extension

Posted on September 15th, 2020 by Renee Narvaez

Bowman prepared a traffic impact analysis, travel demand forecasting, traffic signal warrant analysis, preliminary traffic signal design plan, and provided public involvement support for the 4,000 LF extension of Claiborne Parkway in Loudoun County. The project was locally administered by the County’s Office of Transportation Services, and Bowman also provided survey, environmental permitting services, and roadway and drainage design for the entire project.

Classic & Fine Arts Academy (CAFA)

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its full scope planning, professional design, and construction management services to support the development of a charter school. The project required complex design aspects to accommodate the main facility and its ancillary support buildings and areas. The team also coordinated with local authorities for the expansion of public road and utility infrastructure to connect to the project.

Closter Plaza

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a multi-faceted planning, analysis, and design scheme to redevelop a declining 200,000 sq. ft. community shopping center. The team was challenged to create a more pedestrian friendly design all while providing adequate vehicle site access. Bowman also provided the Site Design, Surveying, and Local, County and State Permitting for the project.

Confidential Conveyor Corridor

Posted on September 15th, 2020 by Renee Narvaez

A new leach pad is being developed to meet the needs of a new pit. A major earthwork project was undertaken to link the existing conveyor system to the new leach pad. As part of this project, Bowman provided temporary traffic control and temporary road designs as well as engineered drawings, specifications, construction scopes of work, and bid packages for the earthwork and new traffic underpass.

Confidential Early Mine Water Supply

Posted on September 15th, 2020 by Renee Narvaez

Bowman developed a water distribution plan to provide potable and construction water to thhis project. This included the design of wells, impoundments, booster stations, overland pipelines and storage facilities. The first stage of this system currently operates at 650 psi and transports water over 2 miles.

Confidential Stormwater Diversions and Culverts

Posted on September 15th, 2020 by Renee Narvaez

Bowman designed three stormwater diversions to protect a leach pad. These diversions required the engineering design of several structures including channels, levees, energy dissipation structures and box culverts. In conjunction with these designs, Bowman developed method specifications for compaction and a design for soil cement that utilized the material sourced from the channel excavation.