Chick-fil-A

Posted on September 15th, 2020 by Renee Narvaez

Chick-fil-A partners with Bowman to provide civil engineering and survey services for new stores across the southeast. Services include site planning, utility design, drainage and grading design, as well as ALTA surveys and topographic and boundary surveys. Bowman also provides permitting services. Building sizes are typically around 5,000 sq. ft. and site sizes range from less than an acre to three acres.

Chessie’s Trail: Lee District Park

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided planning, engineering, surveying, landscape architecture, and environmental consulting services within the 120-acre Lee District Park as part of the Family Recreation Area Spray Park and Accessible Tree House and Chessie Trail development. The accessible trails and tree house project had significant topographic and tree preservation challenges.

Clifton Water/Wastewater Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a PER and Design to replace a trickling filter Wastewater Treatment Plant (WWTP) with a new 200,000 gpd Moving Bed Biological Reactor (MBBR) treatment plant installed inside of the existing concrete treatment tank. Design elements included rehabilitation of the existing influent pump station and existing operations building, a standby generator, and demolition of existing WWTP components. Additional services included surveying and civil design.

Closter Plaza

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a multi-faceted planning, analysis, and design scheme to redevelop a declining 200,000 sq. ft. community shopping center. The team was challenged to create a more pedestrian friendly design all while providing adequate vehicle site access. Bowman also provided the Site Design, Surveying, and Local, County and State Permitting for the project.

Clark’s Branch Bridge Riverbend Park

Posted on September 15th, 2020 by Christina Nichols

Bowman provided watershed analysis, preliminary and final engineering design, environmental investigation and permitting, surveying and construction documentation, for design and installation of the 90 foot span hiker/equestrian bridge span over the Clark’s Branch tributary.

Cape Canaveral Air Force Station Fire Water Line Repair

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided site constriction survey and stakeout support for an active drilling operation consisted of four directional drill sites and approximately 9,300 LF of fire suppression transmission water line. The team was required to provide near real time analysis of alignments and adjust to various site conditions and client constraints.

Cadiz to Hopedale Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning and surveying services to design a complex extension of multiple large pipelines. The project was further challenged by sensitive environmental areas, tight easements, existing infrastructure, and ongoing mining activities.

Caliber Collision

Posted on September 15th, 2020 by Renee Narvaez

The Caliber Collision-Bowman relationship is a national program which covers four states. Bowman provides initial ALTA and design survey services for the development of new centers and engineering services including Special Use Permit preparation and processing, and planning document processing and approvals. Also prepares full construction documents.

Bradley and Carter Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman prepared ALTA/ACSM surveys, detailed topographic survey including necessary road frontage surveying. Approximately 25 acres of topography were required on the Bradley farm site, and approximately 35 acres of topography were required on the Carter farm site, as a minimum 75-foot overlap around the perimeter.

Bowen Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a detailed topographic survey and preliminary engineering services to facilitate initial discussions with Calvert County officials and included a concept plan to illustrate the improvements relating to the proposed solar panels.