Andrews Air Force Base Family Housing

Posted on September 15th, 2020 by Renee Narvaez

Bowman prepared demolition plans for areas proposed for redevelopment of residential units and future commercial and office uses. Scope included preliminary engineering design, layout and grading of roadways and housing units, utility design, stormwater management, topographic and improvement surveys, and an ALTA/ACSM land title survey. Technical review and quality control of final engineering documents were also provided.

31 & 32 Laurens Street

Posted on September 15th, 2020 by Renee Narvaez

Bowman has partnered with Southern Land Company to provide civil engineering and survey services for the development of the Society at Laurens – a luxury, mid-rise apartment community with 148 apartment units located in Charleston, South Carolina, The community will also include a resort style pool, lounge, fitness center, and business center.

Amazon Building (Project Rook)

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided various professional services for this 346,400 sq. ft. warehouse and was responsible for the planning and design of stormwater management, storm drain layouts, water and sanitary sew-er alignments, erosion and sediment control staging, permitting, as well as retrofit design for storm-water pond conversion.

America Online Campus

Posted on September 15th, 2020 by Christina Nichols

Bowman designed a major portion of the 216-acre HQ campus and conducted extensive records research and as-built utility surveys, including sanitary sewer, storm sewer, water, gas, irrigation, fiber optic, telecommunications, and primary and secondary electric service lines.

Alexander’s Crossing

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning, surveying, and civil design serves to deliver a mixed-used development on 701 acres. The team was challenged to incorporate elements of includes retail, office, multi-family, townhome, and single family uses in a tight and topographically constrained site.

Albemarle County Economic Development Site Evaluation

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided engineering services to evaluate the site readiness and economic development suitability of nine properties located within the County-designated growth area to evaluate their po-tential for economic development and the value that Bowman can create through the quantification of site development needs such as entitlements, permits, soils, environmental features, surveys and available infrastructure.

American Furniture Warehouse

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a combination full scope development services starting with the initial survey, through design, and ultimate construction support. The team delivered engineering design services to including boundary verification, topographic analysis, and site improvements. The project required extensive coordination with local and state authorities during the design and permitting processes.

Academies of Loudoun

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for the land planning feasibility and commission permit legislative process, landscape architecture, arboriculture, civil engineering, environmental, and surveying services for Loudoun’s 320,000 sq. ft. premier STEM education facility combining the Academies of Science, Monroe Advanced Technical Academy, and the Academy of Engineering and Technology.

3 Olive Park

Posted on September 15th, 2020 by Ji Lee

Bowman provided planning and preliminary design services for a 158-lot single family residential subdivision on a 40 acre site. Bowman provided land planning and entitlement services including PAD, General Plan Amendment and Preliminary Design documents. The team also worked closely with City planning officials to incorporate future infrastructure expansions into the project’s design.

Alexis Wind Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman established the primary geodetic control network consisting of 20 control monuments throughout a 70,000 acre wind farm development in Western Illinois. Bowman used GPS static observations and advanced post-processing adjustments to establish NAD83 horizontal and NGVD88 vertical datum to support the boundary survey and ALTA/ACSM Land Title Survey and future construction stakeout for this wind farm.