Ballpark Village

Posted on September 15th, 2020 by Renee Narvaez

A Planned Area Development was previously approved for the stadium, practice facilities and basic infrastructure, which are currently in operation. The remaining parcels of land surrounding the facilities remain vacant. Bowman provided engineering and surveying services to support a proposed land use change from intense office to medium- and high-density residential for 60 acres of property in the southern portion of the project.

Bathtub Beach Specific Purpose Survey

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided multiple drone-based laser survey scans to analyze and monitor ongoing beach improvements. The team worked closely with FAA and local authorities for permitted exemptions to operate in prohibited drone areas.

BB&T

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for preparation of topographic survey, coordination with field crew, preparation of Special Use Permit (SUP) application and supporting documents including conceptual plans and exhibits for Plan Commission meeting and public hearing, preparation of construction documents including landscape plans, utilities coordination, coordination and obtainment of permit, and construction administration.

Block Thirty Seven

Posted on September 15th, 2020 by Christina Nichols

Bowman provided civil site engineering services and prepared construction documents for the development of Block Thirty Seven, a mixed-use retail and entertainment, CTA transit station, office and retail project at 108 North State Street.

Blackstone

Posted on September 15th, 2020 by Renee Narvaez

This Lennar community of 232 single family homes is situated adjacent to the prestigious Blackstone Country Club. Bowman reprocessed all entitlements which had expired for this legacy community. Construction documents included extensive coordination with the existing golf course and design of a hilltop playground and recreation area.

75th Street Intersection Improvements

Posted on September 15th, 2020 by Renee Narvaez

Phase I Engineering Services to evaluate four intersections to identify improvements that will address the accident history, increase the safety of the intersections, and create continuity throughout the corridor while minimizing impacts to the operational characteristics of the intersections. Includes Intersection Design Studies, Drainage Technical Memo and preparation of a Project Development Report for 75th Street.

Arbor Terrace

Posted on September 15th, 2020 by Renee Narvaez

Arbor Terrace provides 82 residential units for assisted living within a new three-story building and includes the construction of new internal paved access drives and parking areas throughout the site. Bowman provided civil engineering, surveying, permitting, and construction administration services.

55th Street Reconstruction

Posted on September 15th, 2020 by Renee Narvaez

Phase II design engineering services for the widening and resurfacing of 1.75 miles of 55th Street to address safety and operational needs and to provide expanded pedestrian. The closed drainage sys-tem will be upgraded with new trunk sewers and drainage structures and includes the extension of a 4’x4’ box culvert.

Arlington Public Schools On-Call

Posted on September 15th, 2020 by Renee Narvaez

Bowman was contracted to provide civil engineering services to support the investigation and feasibility of expanding various existing schools in Arlington County.

31 & 32 Laurens Street

Posted on September 15th, 2020 by Renee Narvaez

Bowman has partnered with Southern Land Company to provide civil engineering and survey services for the development of the Society at Laurens – a luxury, mid-rise apartment community with 148 apartment units located in Charleston, South Carolina, The community will also include a resort style pool, lounge, fitness center, and business center.