The Chesterfield Building – West Village

Posted on July 6th, 2023 by Amy Talton

Bowman provided mechanical, electrical, and plumbing engineering design and energy modeling services for the complete gut and renovation of a historic tobacco factory and warehouse into a LEED Gold certified seven-story, 314,000 sq. ft. office and technology center.

6100 Meriweather Office Building & Parking Garage

Posted on July 5th, 2023 by Amy Talton

The project consisted of the MEP engineering and commissioning for a 300,000 sq. ft. core and shell office building and an above ground parking garage with a capacity of approximately 1,400 vehicles and 30 Level 2 EV charging stations. The garage design included a two-bay fire station for Howard County Fire and Rescue.

Pike and Rose Block 3

Posted on July 5th, 2023 by Amy Talton

Bowman was responsible for the mechanical, electrical and plumbing design for the new 253,000 sq. ft., 10-story LEED Gold certified office building and seven-story parking garage located on Block 3 of the Pike and Rose development in Rockville, Maryland. The building includes 7,000 sq. ft. of shell retail space, a fitness center and conference center.

Lowe’s Gallery 64

Posted on February 7th, 2023 by Amy Talton

Museum Place is a mixed-use redevelopment of a former DC school property in Southwest. Our scope of work included the mechanical and plumbing engineering design for Lowe’s Gallery Place, the new multi-unit residential building including a large ground-level outdoor courtyard, and two levels of underground parking structure.

Omni Louisville Hotel

Posted on February 24th, 2022 by editor@bowman

A 30-story mixed-use development in downtown Louisville consist of 612 hotel suites and 225 luxury apartment units. The hotel was built on the site of the former Louisville Water Co., and was design to blend the charm of the city and modern luxury.

Boulder Valley School District – Districtwide Bond Facility Improvements

Posted on January 3rd, 2022 by Suede

Bowman was selected under a multi-year term contract to assist the Boulder Valley School District reach aggressive energy-saving goals outlined in the District’s Sustainable Energy Plan. The plan includes zero net energy targets for new facilities and retrofit energy reductions. Bowman provided commissioning, energy audits, design assistance and monitoring/verifications services.

City of Edgewater Library and Civic Center

Posted on December 15th, 2021 by Suede

Bowman provided energy modeling services for this municipal facility to achieve 47.5% energy cost savings versus code minimum construction, LEED Silver, and $24,000 in rebates from Xcel Energy.

City of Boulder On-Call Energy Evaluation and Climate Action Plan Life Cycle Study

Posted on December 7th, 2021 by Ji Lee

Bowman led a team that analyzed the possibility of reaching the City’s commitment to reducing greenhouse gas emissions in supporting the shift to carbon neutrality, eco-districts and building resiliency that the City is embracing.

City of Boulder On-Call Mechanical and Electrical Engineering

Posted on December 7th, 2021 by Suede

Bowman has been an on-call contract mechanical and electrical engineering service provider to the City of Boulder since 2013 providing MEP design. We are familiar with the Boulder Energy Conservation Code and the City’s commitment to reducing greenhouse gas emissions by at least 80% no later than 2050.

Steamboat Springs School District RE-2 Bond Effort

Posted on December 6th, 2021 by Suede

Bowman was selected as the sole-source district-wide commissioning agent. The 2017 commissioning project involved the modernization of the HVAC and lighting systems at Steamboat Springs Middle School. Our successful work on the middle school led to selection as sole-source commissioning agent for the district’s 2020 bond.