Cross Country Elementary and Middle School

Posted on December 15th, 2023 by Amy Talton

Bowman was responsible for the MEP engineering for the new 95,000 sq. ft. state-of-the-art Elementary and Middle School. The new school will have three floors, equipped with cutting-edge science, art and music labs, even several mindfulness and communal spaces. The project was designed to achieve LEED Gold certification.

UMD BioPark 4MLK Building

Posted on December 7th, 2023 by Christina Nichols

4MLK is the first of two new gateway buildings to be prominently located at the entrance of the research park. Bowman is responsible for the MEP design services for the first Gateway building, a 266,000 sq. ft. facility. The building is designed LEED Silver and exceeds ASHRAE 90.1-2010 by 20%.

The Chesterfield Building – West Village

Posted on July 6th, 2023 by Amy Talton

Bowman provided mechanical, electrical, and plumbing engineering design and energy modeling services for the complete gut and renovation of a historic tobacco factory and warehouse into a LEED Gold certified seven-story, 314,000 sq. ft. office and technology center.

6100 Meriweather Office Building & Parking Garage

Posted on July 5th, 2023 by Amy Talton

The project consisted of the MEP engineering and commissioning for a 300,000 sq. ft. core and shell office building and an above ground parking garage with a capacity of approximately 1,400 vehicles and 30 Level 2 EV charging stations. The garage design included a two-bay fire station for Howard County Fire and Rescue.

Pike and Rose Block 3

Posted on July 5th, 2023 by Amy Talton

Bowman was responsible for the mechanical, electrical and plumbing design for the new 253,000 sq. ft., 10-story LEED Gold certified office building and seven-story parking garage located on Block 3 of the Pike and Rose development in Rockville, Maryland. The building includes 7,000 sq. ft. of shell retail space, a fitness center and conference center.

The Parks at Walter Reed – Building O

Posted on October 28th, 2021 by Jillian Taylor

Bowman provided MEP engineering services for Building O, a mixed-use building including 2,099-unit residents, six retail spaces and parking garage. The Building O design is slated for LEED v4 Silver for Multifamily Mid-rise.

Union on Knox

Posted on October 28th, 2021 by Jillian Taylor

The project is 514,004 gross sq. ft. and includes 341-rental units with a ground floor retail shell for restaurants and mercantile use and a 107,450 sq. ft. underground parking garage. This project is a design build project with two separate contractors, Brenden Mechanical Inc. and Colonial Electric Co. Inc.

Ellen M. Bozman Government Center

Posted on October 28th, 2021 by Amy Talton

MEP engineering for the complete renovation of the main lobby, addition of a conferencing area and library renovation on the first floor, additional conferencing areas, and office renovation on the 2nd floor, office renovation on the 3rd floor and miscellaneous core renovation areas on the garage levels and levels 4-10, totaling 150,000 sq. ft. 

The Medical Pavilion at National Harbor

Posted on October 25th, 2021 by Suede

The project consists of a five-story, 94,000 sq. ft. core and shell medical office building located at National Harbor in Prince Georges County, Maryland. The building includes a covered drop-off, loading dock, glass facade and designed as slab on grade.

Capital One Block A

Posted on October 20th, 2021 by Amy Talton

Bowman is providing MEP engineering design for the 31-story, 729,000 sq. ft. class A, corporate headquarters building in Tyson’s Corner, Virginia. The building features 68,000 sq. ft. of retail space in addition to a 495,000 sq. ft. office. Parking includes eight levels of above grade and four levels below grade.