Sierra Ridge

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided creative design solutions on a challenging topographic residential site. The team also successfully navigated a variety of local, state, and federal permit plans and applications to deliver a successful project.

Sam’s Club Stores/Fueling Stations

Posted on September 15th, 2020 by Jillian Taylor

Bowman has worked on multiple Sam’s Club Store and Fueling Station projects throughout the United States, providing engineering, planning, surveying, and environmental due diligence studies. The scope also included underground utilities, erosion & sediment control and drainage plans.

Ranch Road 12

Posted on September 15th, 2020 by Renee Narvaez

Bowman served as project manager and lead designer/planner and provided environmental assessments for the expansion and realignment of approximately 14 miles of Ranch Road 12 between Dripping Springs and Wimberley in Hays County, Texas. 

Port Imperial

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning and civil design services to creatively tackle a brownfield redevelopment.

Promenade at Castle Rock

Posted on September 15th, 2020 by Renee Narvaez

Bowman delivered civil engineering design services for the 177-acre Promenade project in the Town of Castle Rock, which is one of the largest community center developments in the country.

Parker’s Kitchen

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided site, utility, drainage and stormwater design, as well as rezoning and full permitting services for new ground-up sites in the Charleston SC market. Permitting was conducted with applicable Local, State and Federal agencies. The stores are approx. 5,000 sq. ft. and sites range from 3-6 acres.

Portsmouth Bypass

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided overall design, design management, roadway and drainage design, hydrologic and hydraulic calculations, traffic engineering/management, electrical design, ITS, tolling systems, right-of-way and ATCs through Tender Phase.

Pohick Stream Valley Trail

Posted on September 15th, 2020 by Renee Narvaez

Bowman has provided site engineering design, environmental reconnaissance and permitting, and topographic survey for the construction of five, 80 foot long, fair weather stream crossing structures, and 1,300 lf of new trail construction and rehabilitation of existing trail.

Parks at Walter Reed

Posted on September 15th, 2020 by Renee Narvaez

Bowman is part of a multi-disciplined design and planning team to deliver a multi-year redevelopment of an iconic former military medical center. The team is responsible for preliminary design and planning of civil infrastructure as well as public relations with various government and community bodies.

Parsippany Veterans Park

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering, designing, and planning construction documents for Veterans Park in Parsippany. Working in conjunction with a landscape architect, Bowman provided all necessary civil engineering documents and obtained required permits.