Portsmouth Bypass

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided overall design, design management, roadway and drainage design, hydrologic and hydraulic calculations, traffic engineering/management, electrical design, ITS, tolling systems, right-of-way and ATCs through Tender Phase.

Maryland Live! Casino

Posted on September 15th, 2020 by Christina Nichols

The project included a 200,000 sq. ft. casino with restaurants and a venue for live entertainment, a parking garage, and surface parking on approximately 12 acres of the Arundel Mills Development.

Metro West

Posted on September 15th, 2020 by Renee Narvaez

The team designed a transient-oriented, mixed-use community South of the Vienna-Fairfax Metro Station and north of Route 29 that incorporates a variety of townhomes, condominiums, apartments, convenience retail, commercial office, daycare and public spaces.

Metropolitan Park 6

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided full engineering and surveying support for the project from conceptual design to final construction documents for this mixed-use residential project.

Monterray Waterway C24 Canal

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided emergency design services to retrofit critical storm structures following Hurricane Katrina and worked closely with the City of Port St. Lucie to provide assistance in expediting a solution to a destroyed water retention berm.

Metra/US Route 45 Bridge

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided Phase II engineering design of a two-span steel through girder railroad bridge. The project included modifications to the geometry and configuration of the Metra Southwest Service Line Bridge including raising the bridge profile. The scope of services included the removal and replacement of the railroad bridge over US 45 and a separate pedestrian […]

Mount Cross Road

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided complete right-of-way acquisition services to acquire an easement needed from 18 property owners and was able to obtain voluntary conveyance from a vast majority of the parcels.

Middlesex Regional Water System

Posted on September 15th, 2020 by Christina Nichols

Bowman led the planning, design, permitting and construction phase services of a county-wide water system improvement for the Middlesex Water Authority (MWA). Bowman also assisted the authority in applying for and obtaining $12M in low interest financing and over $3M in grants for the design and construction of this project.

Nelson County Service Authority

Posted on September 15th, 2020 by Renee Narvaez

Bowman currently holds an Annual Engineering Agreement for civil, water/wastewater and surveying services with the Nelson County Service Authority.

Mariner West Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Project was to install a new 10″ pipeline carrying Ethane from the Houston Plant to a point just south of the Ohio River located at the NOVA Chemicals property. This project was originally designed by two different consultants. Bowman was brought in to provide the civil engineering component.