Capital One Headquarters

Posted on October 26th, 2021 by Renee Narvaez

The short circuit analysis, protection device coordination study, and arc flash analysis provides appropriate equipment ratings and settings for all adjustable overcurrent protective devices that are installed in Capital One Office Building. An Arc Flash Study was conducted to calculate the potential arc flash energy at electrical equipment in the system.

3150 Fairview Park Drive

Posted on October 26th, 2021 by Renee Narvaez

Bowman provided Arc Flash analysis for the 260,000 sq. ft. office building in Falls Church, VA. The short circuit analysis, protection device coordination study, and arc flash analysis provides appropriate equipment ratings and settings for all adjustable overcurrent protective devices that are installed in the building.

One Loudoun

Posted on October 25th, 2021 by Renee Narvaez

Bowman provided the mechanical, electrical, and plumbing engineering services for a 500,000 sq. ft. mixed-use entertainment destination development located in Loudoun County, Virginia. The project included a new downtown with a plaza, fountain, movie theater, retail, offices and major grocer. Bowman also designed the main streetscape lighting and power.

Capital One Block A

Posted on October 20th, 2021 by Renee Narvaez

Bowman is providing MEP engineering design for the 31-story, 729,000 sq. ft. class A, corporate headquarters building in Tyson’s Corner, Virginia. The building features 68,000 sq. ft. of retail space in addition to a 495,000 sq. ft. office. Parking includes eight levels of above grade and four levels below grade.

4747 Bethesda Office Building

Posted on October 20th, 2021 by Renee Narvaez

Bowman provided MEP engineering design services for this 14-story 292,000 sq. ft. core and shell class A high-rise office building meeting the WELL Building Institute certification. The building achieved a LEED Gold certification. In addition to the base building systems, Bowman provided the MEP engineering for the tenant interior design.

Dulles International Park – Phases I-II

Posted on September 29th, 2020 by Renee Narvaez

Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.

United States Holocaust Memorial Museum

Posted on September 28th, 2020 by Renee Narvaez

Bowman performed 3D scanning and recordation to establish a system of measuring, documenting and monitoring surface loss, cracking, efflorescent growth, and alignment changes over time on the exterior surfaces of the limestone facades.

Waldorf Astoria Hotel

Posted on September 15th, 2020 by Renee Narvaez

Bowman performed complete 3D laser scanning operations on the full exterior of the Waldorf Astoria in Manhattan to capture the existing conditions and improvements on the main rooftops and two existing towers.

The Mall at Short Hills

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning and civil design to design the 50,000 sq. ft. expansion of a high-end existing mall and parking structure. Design services included rerouting of existing utilities to accommodate the new parking deck, layout of a new restaurant pad site and integration of deck expansion to the existing site facilities.

Trace

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided professional environmental, engineering, and surveying services for this 420-acre residential, commercial and retail development, including preliminary design, site control, boundary surveys, utility system layout, preliminary design of storm water facilities, and final subdivision design for roadways and residential lots.