Cape Canaveral Air Force Station Fire Water Line Repair
Bowman provided site constriction survey and stakeout support for an active drilling operation consisted of four directional drill sites and approximately 9,300 LF of fire suppression transmission water line. The team was required to provide near real time analysis of alignments and adjust to various site conditions and client constraints.