Explorer Pipeline Gilcrease Expressway

Posted on November 18th, 2023 by Jillian Taylor

Explorer Pipeline was directed by the Oklahoma Turnpike Authority to relocate a portion of their 28” pipeline in the western portion of Tulsa County in Oklahoma due to the proposed construction of a new tollway.

Explorer Pipeline Fauna Facility Upgrade

Posted on November 18th, 2023 by Jillian Taylor

The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.

James Bland Pocket Park

Posted on September 18th, 2023 by Jillian Taylor

Bowman worked with city staff, community stakeholders and an archaeologist to develop a design that integrates a community gathering space, an active play area for children 2-5 years old, and the history of the site.

Hanover Tysons

Posted on August 31st, 2023 by Jillian Taylor

Bowman provided full-service engineering, environmental consulting, surveying and construction administration for a new seven-story residential building and structured parking deck in Tysons, VA.

John Lewis Elementary School

Posted on February 7th, 2023 by Jillian Taylor

Bowman provided full civil design and construction documents for John Lewis Elementary School. Project included raze of existing building and construction of new school, including site amenities such as athletic field, playground, courts and off-street parking.

Dominion Energy Critical Transmission Substation Security Plan

Posted on November 30th, 2020 by editor@bowman

Bowman provided state-of-the-art 3D laser scanning services for Dominion Energy’s $500 million Critical Transmission Substation Security Plan program.

Whole Foods Rooftop Solar

Posted on September 15th, 2020 by editor@bowman

Bowman provided surveying services for six Whole Foods Markets sites across Florida. Bowman prepared a topographic survey to provide the basis for the final array layout. Bowman recorded the dimensions of the roof inside of the parapets; the height of the parapet off of the roof deck every 20 feet or where vertical changes occurred.

XTO to Bluestone Pipeline

Posted on September 15th, 2020 by editor@bowman

Bowman provided pipeline and ROW design, project coordination with routing, land agents, environmental, archeological, and geotechnical sub-consultants, construction and surveying, and preparation of construction documents including major horizontal drilling designs for numerous road and railroad crossings, creeks and wetlands.

Southwest Gas Replacement Program

Posted on September 15th, 2020 by editor@bowman

Bowman provides on-call planning and survey services to this statewide utility expansion program. The team delivers right-of-way analysis, topographic surveys, construction stake outs and as built surveys. Includes steel transmission and distribution main replacement, HDD design, neighborhood grid and service replacement, and new development. Also provides pressure test construction, tie-in and corrosion protection details, regulator station design, cost estimates and client/city coordination.

Salt River Project On-Call Survey

Posted on September 15th, 2020 by editor@bowman

Salt River Project (SRP) is one of Arizona’s largest utilities providing low-cost, reliable power and water to Central Arizona. Bowman crews performed 3D scans of all arterial roads, sub-arterial roads, alleys, and canals within these two sections.