Kentucky Owl Park
Bowman was engaged to provide engineering and survey services for the park’s iconic pyramid structures, visitors’ center and both rickhouses.
Bowman was engaged to provide engineering and survey services for the park’s iconic pyramid structures, visitors’ center and both rickhouses.
Explorer Pipeline was directed by the Oklahoma Turnpike Authority to relocate a portion of their 28” pipeline in the western portion of Tulsa County in Oklahoma due to the proposed construction of a new tollway.
The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.
Our team conducted a grounding study of the 13.8 kV Substation Area. An overall ground resistance report was developed and the limitations discussed. A new grounding plan with installation detail drawings for the upgraded ground grid required for new equipment installation was developed along with a grounding study report documenting findings and recommendations.
The project was initiated to upgrade the electrical system for the Ambia compressor station located in Ambia, IN. The facility has four gas-driven reciprocating compressors with ancillary motor loads, multiple building loads and a facility emergency generator.
Our team has provided surveying and subsurface utility consultation services to the environmental sector throughout our years of business. With the continued importance of environmental compliance our services have expanded throughout New Mexico and surrounding states.
To support the design and construction of a new facility and the required utility infrastructure, our surveying and subsurface utility departments worked in conjunction to designate, survey and map existing utility conditions to support planning and design phases.
Our team provided subsurface utility engineering (quality level ‘A’, ‘B’ and ‘D’) services to support future planning and roadway design improvements along US 54 in Carrizozo, NM.
Our firm conducted a field observation/evaluation of the physical and operational characteristics of the vehicle queue lanes at an existing Checkers facility in the South Jersey area.
As prime consultant, we led a team providing survey, design, bidding support, construction management and inspection of the entire 1-mile length of Running Brook Road. The resurfacing of the entire lengths of two adjacent side streets, Heath Drive and Compton Way, an additional 0.3 miles, were added to the project scope during the design phase.