Reno-Sparks Indian Colony Modular Classroom

Posted on November 30th, 2023 by Jillian Taylor

Our team provided land surveying, mapping, civil design and construction support services for the development of a new 1,400 sq. ft. modular classroom with the Reno-Sparks Indian Colony (RSIC).

Unloading Facility & Metering Station

Posted on November 29th, 2023 by Jillian Taylor

JP Energy Partners planned a crude oil gathering, storage and mainline pump facility located south of Cherokee, OK and a crude oil pipeline metering station at Cushing, OK to serve the new Great Salt Plains 8” Crude Pipeline originating in Cherokee, OK and terminating in Cushing, OK.

Velocity Midstream – SCOOP Engineering Review

Posted on November 28th, 2023 by Jillian Taylor

Our team was contracted to carry out a comprehensive electrical engineering review of documentation and drawings provided by the client for the South Central Oklahoma Oil Pipeline (SCOOP) Project that was under construction in south-central Oklahoma.

Holly Frontier Corporation West HVGO Tank 188

Posted on November 28th, 2023 by Jillian Taylor

Holly Frontier’s Truck Loading project in Tulsa, OK implemented an additional means of removing heavy gas oils (HVGO) from storage tank 188 in order to supplement the existing piping discharge.

Four Roses Bourbon Distillery

Posted on November 28th, 2023 by Christina Nichols

Bowman provided 3-D laser scanning, planning and zoning expertise, landscape architecture, survey, site civil engineering, structural engineering and comprehensive construction administration/observation services.

Kentucky Owl Park

Posted on November 28th, 2023 by Christina Nichols

Bowman was engaged to provide engineering and survey services for the park’s iconic pyramid structures, visitors’ center and both rickhouses.

Explorer Pipeline Gilcrease Expressway

Posted on November 18th, 2023 by Renee Narvaez

Explorer Pipeline was directed by the Oklahoma Turnpike Authority to relocate a portion of their 28” pipeline in the western portion of Tulsa County in Oklahoma due to the proposed construction of a new tollway.

Explorer Pipeline Fauna Facility Upgrade

Posted on November 18th, 2023 by Jillian Taylor

The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.

American Castings Foundry Grounding Study

Posted on November 18th, 2023 by Jillian Taylor

Our team conducted a grounding study of the 13.8 kV Substation Area. An overall ground resistance report was developed and the limitations discussed. A new grounding plan with installation detail drawings for the upgraded ground grid required for new equipment installation was developed along with a grounding study report documenting findings and recommendations.

Energy Transfer Partners Ambia Compressor Station

Posted on November 17th, 2023 by Jillian Taylor

The project was initiated to upgrade the electrical system for the Ambia compressor station located in Ambia, IN. The facility has four gas-driven reciprocating compressors with ancillary motor loads, multiple building loads and a facility emergency generator.