Tacoma Water Financial Strategy

Posted on July 1st, 2024 by Renee Narvaez

Located on the shores of Commencement Bay, the City of Tacoma is an industrial port city and the third largest (pop. 220K) in the State of Washington. Because Tacoma and dozens of regional cities have a direct impact on surface waters feeding into Puget Sound, the increasing costs of meeting National Pollutant Discharge Elimination System […]

Riverwalk

Posted on June 26th, 2024 by Renee Narvaez

Our team was selected to be the lead consultant and provided civil engineering and survey services for the redevelopment of the existing Riverwalk Golf Club site. Riverwalk includes 4,300 residential dwelling units, approximately 140,000 sq. ft. of commercial spaces, approximately 1M sq. ft. of office, and a variety of parks and open space.

Seabreeze Senior Living

Posted on June 20th, 2024 by Christina Nichols

Bowman’s goal was to create a sustainable setting using drought-tolerant plants and low water use irrigation systems.

Crystal Drive Streetscape Improvements

Posted on June 17th, 2024 by Renee Narvaez

As part of several distinct projects along the Crystal Drive corridor, Bowman prepared designs for the construction of streetscape improvements including multi-modal transit accommodations with protected bicycle lanes, urban landscaping, green stormwater infrastructure, street lights and infrastructure improvements.

Dysart Unified School District

Posted on May 28th, 2024 by Renee Narvaez

Topographic survey, civil site design, construction services, and construction staking for a new district vehicle support facility on a 26 acre site. The facility has concrete parking for 200 buses, a warehouse and District support and training building.

Buckeye Elementary School

Posted on May 23rd, 2024 by Jillian Taylor

Twenty-eight acre site for construction of new district office, warehouse, bus facility and 4000 LF of half street improvements for a major arterial roadway. We provided civil engineering design services for Durango Road, which included paving, sewer, and public water.

Maricopa Unified School District

Posted on May 21st, 2024 by Jillian Taylor

This project involved topographic survey, new sewer design to replace existing septic system and complete onsite and offsite civil design services, including grading and drainage, domestic water, private fire line, 4 tennis courts, 2 large parking lots, 2 bus drop-offs, all weather running track, football, baseball and softball fields.

Jones Hall for the Performing Arts

Posted on May 10th, 2024 by Christina Nichols

Bowman conducted a comprehensive 3D laser scan of the entire building, from the center stage to the marble-clad exterior. The final Revit model ranged in detail from LOD 200 to 350, depending on the complexity of the space.

Missouri Platte River Flooding

Posted on May 3rd, 2024 by Renee Narvaez

Our team performed all imagery acquisition and processing as well as most of the LiDAR acquisition (approximately 3,100 square miles) for this project. In order to enable capture of peak flood conditions, typical orthoimagery acquisition specifications for no clouds or haze, etc. were not required for this project.

Puerto Rico Disaster Response Aerial Imagery

Posted on April 19th, 2024 by Jillian Taylor

One of the most efficient ways to assess damage across large expanses is to acquire aerial imagery from manned, fixed-wing aircraft. About a week and a half after Hurricane Fiona hit, the U.S. Department of Agriculture (USDA) sent a task order for imagery over the entire island to our team, and we proceeded to design and execute the imagery acquisition efforts.