Ballie Trust Pipeline

Posted on September 15th, 2020 by Christina Nichols

Bowman provided its core planning, survey, and design services to deliver a pipeline expansion project on a very tight deadline. The team had to navigate environmentally sensitive areas, state and federal permitting requirements, endangered animals, and changing landowner consents.

Austin Regional Clinic

Posted on September 15th, 2020 by Renee Narvaez

This project, situated on approximately 2.48 acres, includes medical offices, a coffee shop, and an associated parking lot. Bowman provided site plan preparation including grading, paving, drainage, on site water and wastewater lines design and parking requirements. This was the first site plan in the City of Kyle with zero set back lines. Bowman helped to introduce this new urban development concept to the City.

Blackstone

Posted on September 15th, 2020 by Renee Narvaez

This Lennar community of 232 single family homes is situated adjacent to the prestigious Blackstone Country Club. Bowman reprocessed all entitlements which had expired for this legacy community. Construction documents included extensive coordination with the existing golf course and design of a hilltop playground and recreation area.

America Online Campus

Posted on September 15th, 2020 by Christina Nichols

Bowman designed a major portion of the 216-acre HQ campus and conducted extensive records research and as-built utility surveys, including sanitary sewer, storm sewer, water, gas, irrigation, fiber optic, telecommunications, and primary and secondary electric service lines.

Amazon Building (Project Rook)

Posted on September 15th, 2020 by Christina Nichols

Bowman provided various professional services for this 346,400 sq. ft. warehouse and was responsible for the planning and design of stormwater management, storm drain layouts, water and sanitary sewer alignments, erosion and sediment control staging, permitting, as well as retrofit design for stormwater pond conversion.

Alexander’s Crossing

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning, surveying, and civil design serves to deliver a mixed-used development on 701 acres. The team was challenged to incorporate elements of includes retail, office, multi-family, townhome, and single family uses in a tight and topographically constrained site.

Albemarle County Economic Development Site Evaluation

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided engineering services to evaluate the site readiness and economic development suitability of nine properties located within the County-designated growth area to evaluate their po-tential for economic development and the value that Bowman can create through the quantification of site development needs such as entitlements, permits, soils, environmental features, surveys and available infrastructure.

Academies of Loudoun

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for the land planning feasibility and commission permit legislative process, landscape architecture, arboriculture, civil engineering, environmental, and surveying services for Loudoun’s 320,000 sq. ft. premier STEM education facility combining the Academies of Science, Monroe Advanced Technical Academy, and the Academy of Engineering and Technology.

75th Street Intersection Improvements

Posted on September 15th, 2020 by Renee Narvaez

Phase I Engineering Services to evaluate four intersections to identify improvements that will address the accident history, increase the safety of the intersections, and create continuity throughout the corridor while minimizing impacts to the operational characteristics of the intersections. Includes Intersection Design Studies, Drainage Technical Memo and preparation of a Project Development Report for 75th Street.

55th Street Reconstruction

Posted on September 15th, 2020 by Renee Narvaez

Phase II design engineering services for the widening and resurfacing of 1.75 miles of 55th Street to address safety and operational needs and to provide expanded pedestrian. The closed drainage sys-tem will be upgraded with new trunk sewers and drainage structures and includes the extension of a 4’x4’ box culvert.