Mineral Creek Concrete Liner Repairs

Posted on November 30th, 2022 by Renee Narvaez

A mile-long concrete channel was constructed at the ASARCO Ray Mine to convey contact water from the Mineral Creek outlet downstream near the mine entrance. A mile-long concrete channel was constructed at the ASARCO Ray Mine to convey contact water from the Mineral Creek outlet downstream near the mine entrance.

ASARCO Hayden Operations Slag Processing Project

Posted on November 30th, 2022 by Renee Narvaez

Bowman provided construction management, quality assurance, plant commissioning and coordination between contractors during the commissioning and start-up phase. 

ASARCO Ray Mine Big Box Lake Dredging

Posted on November 30th, 2022 by Renee Narvaez

Bowman is providing construction management services that includes mechanical dredging of approximately 1M cubic yards of sediment, haulage, and disposition of dredged materials to a stockpile area 1.75 miles from the reservoir dam.

Dunaway Water Treatment Facility

Posted on September 14th, 2022 by Renee Narvaez

Our team of experts provided complete civil engineering and surveying services for design, preparation of construction plans and specifications, and permitting, bidding, and construction inspection and administration of a new Water Treatment Plant and stormwater management pond at the Dunaway well site for ECUA.

National Flight Academy and Exhibit Hanger

Posted on September 14th, 2022 by Renee Narvaez

This project included the design and permitting of the National Flight Academy and Exhibit Hanger at the Museum of Naval Aviation on board Pensacola Naval Air Station.

Casey Arborway

Posted on June 8th, 2022 by Renee Narvaez

Provided transportation engineering and conceptual design services. In the planning stage, the team undertook a vast multimodal data collection effort, determined existing and projected traffic volumes, analyzed the traffic operations, prepared VISSIM traffic simulations, developed conceptual designs for both at-grade and bridge replacement alternatives, and participated in extensive public outreach.

Rock Springs Park

Posted on March 11th, 2022 by Renee Narvaez

Park programming for this 120-acre park consisted of a three-field, sodded, lighted, fenced, irrigated soccer pitch area, dog park areas, and a large concession/restroom building and plaza area. The project also required the design and implementation of a new park entrance with all associated lighting.

E. E. Robinson Park

Posted on March 11th, 2022 by Renee Narvaez

A 67-acres park and nature area contained multiple streams, steep slopes, mature landmark trees and beautiful vistas. The county planned to program the park with a multi-purpose field complex, structured picnic area, nature trail with wayfinding and nature kiosks, multiple pavilions and a large playground complex.

Alexander Park

Posted on March 11th, 2022 by Renee Narvaez

Provided landscape architecture and civil design for this 91-acre park that included an informal terraced amphitheater, an 18-hole disc golf course, two miles of paved multi-use trails, a one-mile natural cross country trail, pedestrian plaza, playground, pond fishing piers, an outdoor classroom and multiple pavilions and buildings.

Discovery Park

Posted on March 10th, 2022 by Renee Narvaez

Gwinnett County Community Park’s master plan program includes a multi-use field complex, playground/splashpad complex, a play courts area with three-on-three soccer/basketball/volleyball, a four-square setup and outdoor ping pong. A 1.5-mile perimeter multi-use trail (for walking and bicycling) encompasses the park and connects all use areas.