Erie Canal Channel Multibeam Bathymetric Survey

Posted on March 15th, 2023 by Jillian Taylor

Our team provided multibeam bathymetric scanning services to collect high density survey data below the water line on the Erie Canal in support of the Canal Corporation’s Navigation Information Program. Data was used to determine the nature of obstructions and detailed 3D images/maps of dredged areas.

Champlain Lock Structures

Posted on March 13th, 2023 by Jillian Taylor

Our team provided combined multibeam bathymetric and laser scanning services to simultaneously collect high density survey data above and below water line, in support of the Canal Corporation’s structural inspection program.

Alcove and Basic Reservoirs

Posted on March 13th, 2023 by Jillian Taylor

The City of Albany requested that our team perform updated bathymetric, LiDAR and conventional surveys of Alcove and Basic Reservoirs – two of the three reservoirs that provide the City of Albany with drinking water. The results of these surveys would also provide accurate volumetric estimates and capacity tables for these reservoirs.

North Terminal Rehabilitation

Posted on December 7th, 2022 by Jillian Taylor

Our marine engineers performed structural analysis of the bulkhead and designed the required rehabilitation of damaged sections of the dock bulkhead. Scope included performing repair design underwater inspection, developing conceptual alternates for the rehabilitation and developing estimated construction cost of each option.

Refinery Waterfront Inspection

Posted on December 7th, 2022 by Jillian Taylor

Retained to conduct routine inspection of Philadelphia Energy Solution’s 3.5 miles of refinery waterfront along the Schuylkill River. The waterfront consisted of nine wharves, 22 steel sheet pile bulkhead sections (approximately 8,000 LF of bulkhead) and six categories of miscellaneous structures.

Walking Bridge Replacement

Posted on December 7th, 2022 by Jillian Taylor

Bowman provided damage investigation, claim support, design, permitting, material procurement, and engineering support services during the construction of a approximately 104 FT span walking bridge to replace a pile bent supported walkway that was damaged by an aberrant barge at this petroleum facility.

PBF Logistics Construction Inspection

Posted on December 7th, 2022 by Jillian Taylor

The project involves construction of two mooring dolphins to tie up ships up to 750 ft long (LOA) and other associated construction work. Such construction work starts with the installation of falsework (temporary steel framing) to be able to install production piles at accurate locations and angles in the waterway.

Perth Amboy Dock Renewal & Rehabilitation

Posted on December 7th, 2022 by Jillian Taylor

Retained to perform a thorough underwater inspection of Berths A and B to document the construction and evaluate the current condition of all existing dock structures and design the complete removal and renewal or rehabilitation of Dock A structures in a phased manner.

River Maintenance Dredging

Posted on December 7th, 2022 by Jillian Taylor

Designed, secured permits, and provided bid support and construction management services for the maintenance dredging of sites located on the Arthur Kill River along New Jersey and New York shorelines. Scope of work included pre-dredge surveys, calculating pre-dredge volumes and preparing sediment sampling and analysis plans.

Carteret Dock 1 Renewal

Posted on December 7th, 2022 by Jillian Taylor

Our team was retained to perform an underwater inspection of Dock 1, review the construction and current condition of the existing dock and design the renewal of Dock 1 in a phased manner. Scope of work included developing several alternates for the construction of new breasting and mooring structures with the estimated construction costs.