Bordentown Hotel and Car Wash

Posted on September 29th, 2023 by Jillian Taylor

Our team was retained to perform traffic engineering and highway design services in support of the 128-room, four-story hotel and car wash facility along US Route 206 in Bordentown Township. We prepared the project traffic impact study, highway access permit plans in support of site plan approval by the Township and Access Permit approval by NJDOT.

Page Field (FMY) General Aviation Terminal

Posted on September 27th, 2023 by Jillian Taylor

The complex consists of a 22,000 sq. ft. terminal building, 24,000 sq. ft. bulk hangar, parallel taxiways to two runways, new 600,000 sq. ft. apron along with landside improvements including a new access road and vehicular parking. The project also included utilities, lighting, landscaping, signage and a new fuel farm.

Miromar Outlets

Posted on September 27th, 2023 by Jillian Taylor

Miromar Outlets is situated on a 75-acre parcel located north of Corkscrew Road, between I-75 and Ben Hill Griffin Parkway. The project is a portion of the Timberland and Tiburon DRI, and is zoned CPD with 700,000 sg. ft. of building area approved. Miromar Outlets features more than 140 top designers and brand name outlets, plus restaurants, banks, a gas station and the main offices for Miromar Development Corporation.

Gateway Charter Elementary School

Posted on September 27th, 2023 by Jillian Taylor

Gateway Charter School is a member of the Charter Schools USA family of schools. Charter Schools USA is one of the largest providers of charter school management services in the state of Florida. CSUSA manages private and municipal charters for grades Pre-K through 12.

Fiddler’s Creek Residential Community

Posted on September 26th, 2023 by Jillian Taylor

This 6,000 unit residential/golf course community encompasses 3,932 acres located in southern Collier County. Bowman has provided extensive engineering and surveying services and participated in the planning and environmental permitting of this project.

Coconut Point

Posted on September 26th, 2023 by Jillian Taylor

Bowman helped to bring this unique concept of managing urban living with retail shopping to Southwest Florida. Our team provided site/civil engineering, survey, landscape architecture and construction phase services for the project – the largest of its kind in the United States.

Chico’s

Posted on September 26th, 2023 by Jillian Taylor

Bowman continues to serve Chico’s as their Site Development Engineer as they aggressively grow and expand. The original 27-acre site served the corporation for design, research, marketing and other administrative functions.

James Bland Pocket Park

Posted on September 18th, 2023 by Jillian Taylor

Bowman worked with city staff, community stakeholders and an archaeologist to develop a design that integrates a community gathering space, an active play area for children 2-5 years old, and the history of the site.

Cumberland Drive

Posted on September 1st, 2023 by Ji Lee

Our team redesigned Cumberland Drive between Military Trail and Village Boulevard to accommodate one-way, separated bicycle lanes using vertical delineators. The project also included design of a roundabout at the Saratoga Road intersection that accommodated separate bicycle and pedestrian crossing treatments. Efforts included agency coordination.

Hanover Tysons

Posted on August 31st, 2023 by Ji Lee

Bowman provided full-service engineering, environmental consulting, surveying and construction administration for a new seven-story residential building and structured parking deck in Tysons, VA.