Chinese Cultural Center

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided professional design and platting services for a 30-acre cultural theme center. The team was responsible for the layout and design of public infrastructure including roads, utilities and underground stormwater retention.

Clifton Water/Wastewater Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a PER and Design to replace a trickling filter Wastewater Treatment Plant (WWTP) with a new 200,000 gpd Moving Bed Biological Reactor (MBBR) treatment plant installed inside of the existing concrete treatment tank. Design elements included rehabilitation of the existing influent pump station and existing operations building, a standby generator, and demolition of existing WWTP components. Additional services included surveying and civil design.

Chick-fil-A

Posted on September 15th, 2020 by Renee Narvaez

Chick-fil-A partners with Bowman to provide civil engineering and survey services for new stores across the southeast. Services include site planning, utility design, drainage and grading design, as well as ALTA surveys and topographic and boundary surveys. Bowman also provides permitting services. Building sizes are typically around 5,000 sq. ft. and site sizes range from less than an acre to three acres.

Calumet

Posted on September 15th, 2020 by Renee Narvaez

Bowman team designed and planned a 900 plus unit residential subdivision as well as public road and utility infrastructure. The team was challenged with creating a site sensitive design while maximizing the total allowable dwelling units all while balancing community buy in with the town residence and adjacent neighbors.

Caliber Collision

Posted on September 15th, 2020 by Renee Narvaez

The Caliber Collision-Bowman relationship is a national program which covers four states. Bowman provides initial ALTA and design survey services for the development of new centers and engineering services including Special Use Permit preparation and processing, and planning document processing and approvals. Also prepares full construction documents.

Caldwell Park

Posted on September 15th, 2020 by Renee Narvaez

Caldwell Park is a 120-acre mixed-use development that includes 115 single-family lots, 131 townhomes and 286 apartments, along with 200,000 sq. ft. of commercial space. Bowman provided its core planning, surveying, and civil design serves to deliver the project. The team was challenged to incorporate elements of retail, office, multi-family, townhome, and single family uses in a tight and topographically constrained site.

Bruce Avenue Drainage Project

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, surveying and design services to the City of Colonial Heights for the Phase III and IV drainage and utility improvement plans of the Bruce Avenue Drainage Improvements project. This project included approximately 6,500 linear feet of city streets. The scope of the project included complete water, sanitary sewer and storm sewer replacement. The project also involved substantial excavation of the roadways within the ROW limits and rebuilding of new asphalt sections and curb and gutter.

Bordetown Waterfront Community

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering, landscape architecture and surveying services for the second phase of this large redevelopment project consisting of multi-family housing with 157 townhouses and 176 apartment units, and an amphitheater and shade structure overlooking the Delaware River.

Broadway Water Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided major upgrades to the Town of Broadway’s Water Treatment Plant. The upgrades included the installation of a state of the art 1.8MGD Pall Corp. MF membrane treatment system in a new concrete filtration building, upgraded and automated chemical feed systems, a 100,000-gallon well storage tank, and a 350,000-gallon finished water clear well.

Catlett – Calverton Wastewater System

Posted on September 15th, 2020 by Renee Narvaez

Bowman partnered with English Construction for this Design-Build project for a central wastewater collection, treatment and disposal system to serve the service districts of Catlett and Calverton. The project includes a new collection system consisting of individual Septic Tank Effluent Pump (STEP) systems that transfer wastewater to a 80,000 gpd central wastewater treatment plant utilizing an Integrated Fixed Film Activated Sludge (FAS) technology. Effluent will be disposed of through the use of subsurface drip irrigation drain fields.