Closter Plaza

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a multi-faceted planning, analysis, and design scheme to redevelop a declining 200,000 sq. ft. community shopping center. The team was challenged to create a more pedestrian friendly design all while providing adequate vehicle site access. Bowman also provided the Site Design, Surveying, and Local, County and State Permitting for the project.

Chinese Cultural Center

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided professional design and platting services for a 30-acre cultural theme center. The team was responsible for the layout and design of public infrastructure including roads, utilities and underground stormwater retention.

Caliber Collision

Posted on September 15th, 2020 by Renee Narvaez

The Caliber Collision-Bowman relationship is a national program which covers four states. Bowman provides initial ALTA and design survey services for the development of new centers and engineering services including Special Use Permit preparation and processing, and planning document processing and approvals. Also prepares full construction documents.

Canton Car Wash

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided surveying, land planning, and engineering services. Given the unique nature of this car wash project it required an analysis of both automobile and pedestrian circulation patterns within the site to ensure safety of users and the public. This project took a highly visible, dilapidated and under-utilized piece of industrial real estate and transformed it into an attractive “green” commercial site.

Berkeley Business Park

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, surveying, and civil engineering services for this multi-phased redevelop-ment project. Scope included a Land Development Unit plan with layouts for stormwater and sanitary sewers, topographic and route surveys, land records research, easement and right-of-way acquisi-tions, supplemental landscape plans, conceptual design development and evaluation, final construc-tion drawing preparation, construction administration, construction stakeout, and more.

BB&T

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for preparation of topographic survey, coordination with field crew, preparation of Special Use Permit (SUP) application and supporting documents including conceptual plans and exhibits for Plan Commission meeting and public hearing, preparation of construction documents including landscape plans, utilities coordination, coordination and obtainment of permit, and construction administration.

American Furniture Warehouse

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a combination full scope development services starting with the initial survey, through design, and ultimate construction support. The team delivered engineering design services to including boundary verification, topographic analysis, and site improvements. The project required extensive coordination with local and state authorities during the design and permitting processes.

America Online Campus

Posted on September 15th, 2020 by Renee Narvaez

Bowman was responsible for the design of a major portion of this 216-acre HQ campus and provided extensive records research; as-built surveys for sanitary sewer main and service line; storm sewer, water main, secondary service line; fiber optic duct bank; irrigation line; and gas main and secondary service line location surveys, as well as telecommunications; and primary and secondary service electric line surveys.

Amazon Building (Project Rook)

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided various professional services for this 346,400 sq. ft. warehouse and was responsible for the planning and design of stormwater management, storm drain layouts, water and sanitary sew-er alignments, erosion and sediment control staging, permitting, as well as retrofit design for storm-water pond conversion.