Permian Basin Asset Management & Emissions Data Collection Program

Posted on February 12th, 2026 by Christina Nichols

Bowman provided asset management and geospatial data collection services for a leading exploration and production company operating in the Permian Basin region of Texas. The projects include work across nearly 1,000 total well site and facilities.

200MW Power Island Design for LNG Operations

Posted on February 11th, 2026 by Christina Nichols

Bowman was tapped to prepare an issued for construction (IFC) package for a 200 MW power island supporting liquefied natural gas (LNG) operations along the Gulf Coast. The system design integrated five gas turbine generator packages with supporting balance of plant infrastructure to meet the facility’s demanding power needs.

Rockcliff Energy Saltwater Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman partnered with Rockcliff Energy to conduct a preliminary survey and perform construction staking for an 88-mile saltwater gathering system. This system, designed to enhance the efficiency of saltwater disposal in midstream operations, aimed to eliminate the dependence on conventional 18-wheeler disposal methods.

Preliminary Survey for Natural Gas Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman secured a contract to conduct a preliminary survey for a 55-mile gas gathering pipeline, which is designed to gather natural gas from several well locations and transports it to a liquefied natural gas (LNG) plant in Southwest Louisiana.

Pipeline Integrity Support

Posted on February 28th, 2024 by Jillian Taylor

Bowman was contracted to provide integrity support services for 41 miles of pipeline across East Texas and Northwest Louisiana. To ensure the reliability and safety of the energy infrastructure, our team conducted depth of cover surveys to assess the position of pipelines beneath the surface.

Gas Gathering Collection System Survey

Posted on February 28th, 2024 by Jillian Taylor

Bowman was engaged to provide open ditch as-built surveys for 315 miles of natural gas gathering systems. Bowman not only provided an accurate representation of the existing infrastructure but also served as a valuable resource for future maintenance, expansion and regulatory compliance.

Unloading Facility & Metering Station

Posted on November 29th, 2023 by Jillian Taylor

JP Energy Partners planned a crude oil gathering, storage and mainline pump facility located south of Cherokee, OK and a crude oil pipeline metering station at Cushing, OK to serve the new Great Salt Plains 8” Crude Pipeline originating in Cherokee, OK and terminating in Cushing, OK.

Velocity Midstream – SCOOP Engineering Review

Posted on November 28th, 2023 by Jillian Taylor

Our team was contracted to carry out a comprehensive electrical engineering review of documentation and drawings provided by the client for the South Central Oklahoma Oil Pipeline (SCOOP) Project that was under construction in south-central Oklahoma.

Holly Frontier Corporation West HVGO Tank 188

Posted on November 28th, 2023 by Jillian Taylor

Holly Frontier’s Truck Loading project in Tulsa, OK implemented an additional means of removing heavy gas oils (HVGO) from storage tank 188 in order to supplement the existing piping discharge.

Explorer Pipeline Gilcrease Expressway

Posted on November 18th, 2023 by Renee Narvaez

Explorer Pipeline was directed by the Oklahoma Turnpike Authority to relocate a portion of their 28” pipeline in the western portion of Tulsa County in Oklahoma due to the proposed construction of a new tollway.