Rockcliff Energy Saltwater Gathering System
Bowman partnered with Rockcliff Energy to conduct a preliminary survey and perform construction staking for an 88-mile saltwater gathering system. This system, designed to enhance the efficiency of saltwater disposal in midstream operations, aimed to eliminate the dependence on conventional 18-wheeler disposal methods.