Cross Country Elementary and Middle School

Posted on December 15th, 2023 by Amy Talton

Bowman was responsible for the MEP engineering for the new 95,000 sq. ft. state-of-the-art Elementary and Middle School. The new school will have three floors, equipped with cutting-edge science, art and music labs, even several mindfulness and communal spaces. The project was designed to achieve LEED Gold certification.

UMD BioPark 4MLK Building

Posted on December 7th, 2023 by Christina Nichols

4MLK is the first of two new gateway buildings to be prominently located at the entrance of the research park. Bowman is responsible for the MEP design services for the first Gateway building, a 266,000 sq. ft. facility. The building is designed LEED Silver and exceeds ASHRAE 90.1-2010 by 20%.

Federal Aviation Administration, ATCT Life Safety Assessments

Posted on October 4th, 2023 by Ji Lee

At over 65 locations throughout the eastern United States, our team designed modifications to air traffic control towers’ (ATCT) fire and life safety systems in order to comply with new OSHA standards and FAA criteria.

Joint Base Andrews Family Housing

Posted on August 23rd, 2023 by Jillian Taylor

As part of the effort to replace the military’s inventory of obsolete and inadequate housing with safe, comfortable homes for military families, JB Andrews hopes to rehabilitate existing units and provide new units, producing high quality housing for military families.

CBRNE APG Command HQ Buildings 5016 & 5046

Posted on July 10th, 2023 by Amy Talton

Bowman provided commissioning services for the 20th CBRNE HQ facility. Design included renovating existing buildings 5016 and 5046, totaling 94,472 sq. ft. and 92,006 sq. ft. to provide a command suite with offices, SCIF, arms room, operations center, conference rooms, file and functions of a standard command and control facility.

Baltimore Ravens Under Armour Performance Center

Posted on July 6th, 2023 by Amy Talton

Bowman provided mechanical, electrical and plumbing design engineering for the interior renovation of the 113,237 sq. ft. training facility, as well as a 46,000 sq. ft., two-story addition to the Baltimore Raven’s Under Armour Performance Center.

Lawyers Mall Underground Infrastructure

Posted on July 6th, 2023 by Amy Talton

The project is a multi-phased project to replace aged underground infrastructure utility systems (steam, chilled water, water, storm water, gas, electricity, and IT/data telecommunications) that sustain historic state buildings, including the House of Delegates Building and the three buildings (Legislative, State House, and Governor’s House) that make up Lawyer’s Mall.

Smithburg High School HVAC Replacement

Posted on July 6th, 2023 by Amy Talton

Bowman provided engineering design services for the upgrade/replacement of the school’s entire HVAC system, which also includes the roof replacement for this 129,460 sq. ft. facility. Design incorporated new technologies, employing a year-round dehumidification, improved air filtration and distribution, improved efficiency, and implementation of modern controls and operations.

6100 Meriweather Office Building & Parking Garage

Posted on July 5th, 2023 by Amy Talton

The project consisted of the MEP engineering and commissioning for a 300,000 sq. ft. core and shell office building and an above ground parking garage with a capacity of approximately 1,400 vehicles and 30 Level 2 EV charging stations. The garage design included a two-bay fire station for Howard County Fire and Rescue.

Pike and Rose Block 3

Posted on July 5th, 2023 by Amy Talton

Bowman was responsible for the mechanical, electrical and plumbing design for the new 253,000 sq. ft., 10-story LEED Gold certified office building and seven-story parking garage located on Block 3 of the Pike and Rose development in Rockville, Maryland. The building includes 7,000 sq. ft. of shell retail space, a fitness center and conference center.