Unloading Facility & Metering Station

Posted on November 29th, 2023 by Jillian Taylor

JP Energy Partners planned a crude oil gathering, storage and mainline pump facility located south of Cherokee, OK and a crude oil pipeline metering station at Cushing, OK to serve the new Great Salt Plains 8” Crude Pipeline originating in Cherokee, OK and terminating in Cushing, OK.

Velocity Midstream – SCOOP Engineering Review

Posted on November 28th, 2023 by Jillian Taylor

Our team was contracted to carry out a comprehensive electrical engineering review of documentation and drawings provided by the client for the South Central Oklahoma Oil Pipeline (SCOOP) Project that was under construction in south-central Oklahoma.

Holly Frontier Corporation West HVGO Tank 188

Posted on November 28th, 2023 by Jillian Taylor

Holly Frontier’s Truck Loading project in Tulsa, OK implemented an additional means of removing heavy gas oils (HVGO) from storage tank 188 in order to supplement the existing piping discharge.

Explorer Pipeline Fauna Facility Upgrade

Posted on November 18th, 2023 by Christina Nichols

The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.

American Castings Foundry Grounding Study

Posted on November 18th, 2023 by Jillian Taylor

Our team conducted a grounding study of the 13.8 kV Substation Area. An overall ground resistance report was developed and the limitations discussed. A new grounding plan with installation detail drawings for the upgraded ground grid required for new equipment installation was developed along with a grounding study report documenting findings and recommendations.

Energy Transfer Partners Ambia Compressor Station

Posted on November 17th, 2023 by Jillian Taylor

The project was initiated to upgrade the electrical system for the Ambia compressor station located in Ambia, IN. The facility has four gas-driven reciprocating compressors with ancillary motor loads, multiple building loads and a facility emergency generator.

The Chesterfield Building – West Village

Posted on July 6th, 2023 by Renee Narvaez

Bowman provided mechanical, electrical, and plumbing engineering design and energy modeling services for the complete gut and renovation of a historic tobacco factory and warehouse into a LEED Gold certified seven-story, 314,000 sq. ft. office and technology center.

Baltimore Ravens Under Armour Performance Center

Posted on July 6th, 2023 by Christina Nichols

Bowman provided mechanical, electrical and plumbing design engineering for the interior renovation of the 113,237 sq. ft. training facility, as well as a 46,000 sq. ft., two-story addition to the Baltimore Raven’s Under Armour Performance Center.

Lawyers Mall Underground Infrastructure

Posted on July 6th, 2023 by Renee Narvaez

The project is a multi-phased project to replace aged underground infrastructure utility systems (steam, chilled water, water, storm water, gas, electricity, and IT/data telecommunications) that sustain historic state buildings, including the House of Delegates Building and the three buildings (Legislative, State House, and Governor’s House) that make up Lawyer’s Mall.

Smithburg High School HVAC Replacement

Posted on July 6th, 2023 by Amy Talton

Bowman provided engineering design services for the upgrade/replacement of the school’s entire HVAC system, which also includes the roof replacement for this 129,460 sq. ft. facility. Design incorporated new technologies, employing a year-round dehumidification, improved air filtration and distribution, improved efficiency, and implementation of modern controls and operations.