Ellsworth Road

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided extensive planning, design, and construction support services to deliver a complicated expansion of major public infrastructure. The team worked closely with local residents, municipal bodies, and governing utility boards to ensure all stakeholders concerns were understood and addressed in the planning process.

Fairfax Village Neighborhood Center

Posted on September 15th, 2020 by editor@bowman

The Fairfax Village Neighborhood Center is part of the U.S. Army Residential Communities Initiative to upgrade, redevelop and provide market rate residential housing and amenities for the men and women of our armed forces. The project was awarded LEED-NC 2.2 Platinum Certification by the United States Green Building Council.

CR 266

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided core planning, drainage design, land surveying and environmental services for roadway improvements to an additional 1.9-mile section of CR 266. The team worked closely with local and state officials to ensure planning and ultimate design met growth targets and municipal goals. The team also coordinated with utility companies for the extension and or relocation of service lines.

CTC on Marley Park

Posted on September 15th, 2020 by Renee Narvaez

Located in the prestigious Marley Park Community, this 173 unit, 14.7 acre development features two-bedroom or duplex one-bedroom single story homes with high-end amenities and private backyards. Bowman provided planning, entitlement support, site planning, preliminary and final engineering, and construction support services.

Confidential Wash Settlers

Posted on September 15th, 2020 by editor@bowman

Bowman, having previously designed the original settlers during another project, designed two new Wash Settlers with related structures, containment, equipment, storage, piping and instrumentation.

County Road 8 – Bridge over Fraser River

Posted on September 15th, 2020 by Renee Narvaez

Phase I and II services for replacement of existing steel beam bridge at County Road 8 and the Fraser River, originally constructed in 1979. A bridge hydraulic report and scour analysis were prepared for this project. Proposed structure is 47 feet wide with span of 46 feet Prestressed Precast Concrete (PPC) Deck Beams with a 6-inch cast-in-place concrete slab, founded on pile bent abutments.

Culver’s

Posted on September 15th, 2020 by editor@bowman

Bowman currently works with Culver’s to help expand their footprint in Florida and throughout the Southeast market. Bowman’s retail experts work closely with the owners to provide conceptual site planning, site development plans, civil construction documents, site entitlement, permitting and construction management.

Dominion Power

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided topographic, physical and boundary surveying services, as well as civil engineering services including grading, drainage, and erosion & sediment control. The team was challenged to design with existing drainage problems in an area prone to flooding.

Connell Solar L’Oreal Headquarters

Posted on September 15th, 2020 by Renee Narvaez

Bowman obtained land use approvals for this LEED Gold Certified headquarters. The project sits on 12.83 acres and included the installation of over 21,000 sq. ft. of rooftop solar panels and 91,000 sq. ft. of parking lot canopy solar panels. Bowman performed initial due diligence research of municipal zoning, site plans, and coordination through the approval process.

Discovery Elementary School

Posted on September 15th, 2020 by editor@bowman

Bowman provided civil engineering, surveying, scanning, and construction administration services to support this new 98,000 sq. ft. elementary school on 25 acres.