John Rolfe Pkwy & Ridgefield Pkwy Sidewalk Improvements

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided planning, surveying and civil design services including topographic and route surveys, land records research, easement and right-of-way acquisitions, tree inventory/analysis/management and supplemental landscape plans. Also provided conceptual design development, final construction drawing preparation, cost estimating, bid phase services, construction administration, construction stakeout, as-built surveys and close out reporting.

John Rolfe Square

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying and platting, civil engineering, traffic signal design, rezoning, public participation, construction plan approvals, and construction administration for an upscale, urban village style, 55+ age single-family neighborhood, community park, extensive landscaping, and amenities. Bowman also facilitated a solution to provide extensive planning and hardscape design amidst existing easements associated with prior roadway plans.

Johnson Ranch North Subdivision

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided professional engineering and surveying services including preliminary design, site control, utility system layout, site and lot grading, stormwater facility design, preparation of subdivision construction plans and final plats, and construction phase services for this 287-acre commercial and residential development. Bowman also prepared and obtained an Edwards Aquifer Contributing Zone Permit through the Texas Commission on Environmental Quality.

Kanner Crossing

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering and surveying services for this project. The design and permitting included parking lots, driveways, stormwater management system, potable water distribution system and wastewater collection/transmission system. Bowman provided construction observation services and certification of the various permits received from the required regulatory agencies.

La Cima Subdivision

Posted on September 15th, 2020 by Renee Narvaez

La Cima is a 2,031-acre master-planned residential development consists of approximately 2,000 single-family lots, a 200-acre commercial area, an elementary school, an amenity center, many wastewater lift stations, a water storage tank, and multiple detention ponds.

Fox Gate

Posted on September 15th, 2020 by Renee Narvaez

The proposed Fox Gate development is located on 19 acres alongside Route 50 near the Fairfax County line. The project consists of approximately 600,000 sq. ft. of mixed-use space including office, retail, civic, and residential uses.

Gas Main Installations and Bridge Support

Posted on September 15th, 2020 by Renee Narvaez

Bowman provides design engineering services to Peoples Gas, Light and Coke Company (PGL) for PGL’s Accelerated Main Replacement Program (AMRP). These engineering services are for gas main installation and replacement projects the design of permanent bridge supports of existing gas mains at proposed utility crossings, and maintenance of traffic plans for neighborhood projects.

Grover Road Intersection Improvements

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided support under an active on-call multi-year agreement with the Anne Arundel County Department of Public Works. The project required final engineering and surveying for roadway widening, turn-lane construction and drainage improvements.

Hamilton Safety Center

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering and surveying services for this project, which included a 17,000 sq. ft. building with 6 attached bays for fire and rescue vehicles and a 5,400 sq. ft. annex building. A site plan was developed and processed through the Town of Hamilton and included design for stormwater, sanitary sewers, water, and stormwater management.

Henderson Way Road Improvements

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided design for the 3.8-acre site that required engineering efforts from a detailed site plan through final engineering and surveying. Additionally, the team is responsible for permitting and construction oversight once designs are completed.