McFarland Solar Facility

Posted on October 6th, 2025 by Angelique

This project entailed development of a large-scale, 3,000+ acre solar facility, delivering the project from concept through completion. Our multidisciplinary team combined civil, structural, hydrology, and permitting expertise to design and implement a resilient renewable energy solution. The project demanded innovative approaches to site grading, drainage, and well siting, ensuring long-term performance and environmental compliance.

Gaskell Solar

Posted on October 6th, 2025 by Angelique

Our team supported the development of a 600-acre, 105 MW solar facility with an integrated 20 MW battery energy storage system (BESS). The project combines solar generation with on-site storage to improve energy reliability and flexibility, aligning with California’s clean energy targets.

Clover Creek Solar

Posted on October 6th, 2025 by Angelique

Our team provided engineering and permitting services for a 500-acre, 80 MW solar facility supporting the full scope of civil, structural and hydrology design. The project emphasized sustainable site planning and stormwater management, incorporating meticulously engineered drainage channels to optimize water conveyance and ensure long-term site resilience.

Murray Morgan Bridge Rehabilitation

Posted on November 8th, 2024 by Ji Lee

Our engineers played a key role on the design-build team for the federally funded rehabilitation of this historic 1,700-foot-long bridge—a combination concrete girder and steel truss movable structure spanning the Thea Foss Waterway and the BNSF mainline. The project involved extensive structural repairs, including the replacement of the truss bottom chord, gusset plates, steel stringers, […]

ODOT Bridge Scoping Projects – Region 1 and 5

Posted on November 8th, 2024 by Ji Lee

Engaged by ODOT, our team developed scopes of service for local bridge projects, delivering cost estimates, engineering data, and assessments of right-of-way and environmental impacts. Serving ODOT Regions 1 and 5, we provided precise documentation and adhered to ODOT’s General Expectations to ensure responsible, long-term value for public funds.

I-5 Rose Quarter Improvements

Posted on November 7th, 2024 by Ji Lee

As Engineer of Record, our team oversees major wall structures and provides structural engineering for new street connections and upgrades along I-5 from I-405 to the Morrison Bridge, including the Broadway/Weidler Interchange. Scope includes seismic evaluations for nine bridges and Phase 1 seismic retrofits to enhance infrastructure resilience.

US197 The Dalles (Columbia River) Bridge Deck Replacement

Posted on November 7th, 2024 by Ji Lee

Provided structural engineering services for bridge deck replacement, expansion joint installation, and utility coordination on a historic bridge connecting Dallesport, WA, and The Dalles, OR. Project utilized Accelerated Bridge Construction (ABC) to minimize closures and impact.

Nisqually River Trestle Flood Damage Repairs Design

Posted on November 7th, 2024 by Ji Lee

Following flood damage near Elbe, Washington, our team assessed and designed the replacement of the Nisqually River Trestle on Tacoma Rail’s Mountain Division Line. We evaluated multiple bridge alternatives, selecting a two-span steel plate girder bridge for optimal performance, cost-efficiency, and environmental compliance, ensuring a resilient and sustainable rail connection.

Los Angeles County MTA Purple Line Extension

Posted on November 7th, 2024 by Ji Lee

Our team served as Engineer of Record for LA Metro’s Westside Purple Line Extension, designing Century City/Constellation Station and reviewing plans for Wilshire/Rodeo Station. The project demanded advanced soil-structure interaction, 3D modeling, and excavation support to ensure stability beneath densely developed areas along Wilshire Boulevard, factoring in seismic resilience and loading impacts from nearby high-rise buildings in this urban infrastructure initiative.

Redondo Boardwalk Emergency Repair

Posted on November 7th, 2024 by Ji Lee

Our team partnered with the City of Des Moines to restore the storm-damaged Redondo Boardwalk along Poverty Bay. Services included project management, structural engineering, environmental permitting, and construction oversight. Key repairs involved replacing girders, decking, and support elements, with FHWA funding accelerating timelines. The new design improves resilience, featuring concrete decking with wood-grain texture and UV-resistant coatings for longevity.