Layton Lakes

Posted on September 15th, 2020 by Renee Narvaez

Bowman provides its core design and surveying services to design a 550-lot master planned lake side community. The team was required to work closely with multiple local and federal municipal authorities as well as exiting adjacent property owners to deliver the project amid a turbulent residential real estate market.

Martin County Aquatic Center

Posted on September 15th, 2020 by Renee Narvaez

The project includes the site civil engineering for the County Aquatic Center consisting of four pools and associated recreational amenities. Design and permitting of site civil engineering features including pool decking and drainage, access roadways and parking, stormwater management conveyance facilities, stormwater storage and treatment, site grading, water and wastewater utilities.

Mariposa Point of Gilbert

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided land planning services, rezoning, design review, surveying and civil improvement design. The project site required design of on-site retention, half-street improvements along Quartz Street and Willis Road, and substantial coordination with public utility providers SRP, Southwest Gas and RWCD.

LaGrange Winery

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, surveying, engineering, and environmental services on this project. Scope of work included the development of a site plan with a parking area layout, preparation of a special use permit plan and plat, a boundary survey, an environmental constraints analysis, a perennial flow determination, support of a cultural resource analysis, and a traffic management plan for the site.

I-290 to I-90/94 (Jane Byrne/Circle Interchange)

Posted on September 15th, 2020 by Amy Talton

CM services for bridge/retaining wall construction, roadway reconstruction, erosion control and protection, utility relocation of storm sewers, water tunnels, special waste excavation, earth excavation and embankment, removal of existing improvements, pavements, marking/signage, lighting, ITS, traffic control and protection, and urban enhancements.

Horry County Stormwater Assistance

Posted on September 15th, 2020 by Renee Narvaez

Bowman assisted the County in reviewing and updating their Stormwater Management Ordinance and Design Manual and in the development of a Monitoring and Assessment Plan, Enforcement Response Plan and pollution prevention/good housekeeping procedures.

Hutto YMCA

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core services including planning, layout, surveying, design and coordination, permitting, bidding and construction observation for this 4-acre YMCA facility. In addition, Bowman was tasked with the coordination of all approvals, permitting and platting with the City of Hutto, Williamson County, and the Texas Commission of Environmental Quality (TCEQ).

Johnson Ranch North Subdivision

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided professional engineering and surveying services including preliminary design, site control, utility system layout, site and lot grading, stormwater facility design, preparation of subdivision construction plans and final plats, and construction phase services for this 287-acre commercial and residential development. Bowman also prepared and obtained an Edwards Aquifer Contributing Zone Permit through the Texas Commission on Environmental Quality.

Kanner Crossing

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided civil engineering and surveying services for this project. The design and permitting included parking lots, driveways, stormwater management system, potable water distribution system and wastewater collection/transmission system. Bowman provided construction observation services and certification of the various permits received from the required regulatory agencies.

La Cima Subdivision

Posted on September 15th, 2020 by Renee Narvaez

La Cima is a 2,031-acre master-planned residential development consists of approximately 2,000 single-family lots, a 200-acre commercial area, an elementary school, an amenity center, many wastewater lift stations, a water storage tank, and multiple detention ponds.