Charles City County Annual Services Contract

Posted on September 15th, 2020 by Renee Narvaez

Bowman was selected to perform utility engineering services for various water and wastewater systems. Bowman is responsible for attending various meetings with County staff and Supervisors, regulatory officials and representatives from the funding agencies in pursuit of financing for the below identified projects, as well as attending public meetings.

Closter Plaza

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a multi-faceted planning, analysis, and design scheme to redevelop a declining 200,000 sq. ft. community shopping center. The team was challenged to create a more pedestrian friendly design all while providing adequate vehicle site access. Bowman also provided the Site Design, Surveying, and Local, County and State Permitting for the project.

Chessie’s Trail: Lee District Park

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided planning, engineering, surveying, landscape architecture, and environmental consulting services within the 120-acre Lee District Park as part of the Family Recreation Area Spray Park and Accessible Tree House and Chessie Trail development. The accessible trails and tree house project had significant topographic and tree preservation challenges.

Confidential Stormwater Diversions and Culverts

Posted on September 15th, 2020 by Renee Narvaez

Bowman designed three stormwater diversions to protect a leach pad. These diversions required the engineering design of several structures including channels, levees, energy dissipation structures and box culverts. In conjunction with these designs, Bowman developed method specifications for compaction and a design for soil cement that utilized the material sourced from the channel excavation.

Clarks Branch Bridge Riverbend Park

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided watershed analysis, preliminary and final engineering design, environmental investigation and permitting, surveying and construction documentation, for design and installation of the 90 foot span hiker/equestrian bridge span over the Clark’s Branch tributary.

Confidential Early Mine Water Supply

Posted on September 15th, 2020 by Renee Narvaez

Bowman developed a water distribution plan to provide potable and construction water to thhis project. This included the design of wells, impoundments, booster stations, overland pipelines and storage facilities. The first stage of this system currently operates at 650 psi and transports water over 2 miles.

Chick-fil-A

Posted on September 15th, 2020 by Renee Narvaez

Chick-fil-A partners with Bowman to provide civil engineering and survey services for new stores across the southeast. Services include site planning, utility design, drainage and grading design, as well as ALTA surveys and topographic and boundary surveys. Bowman also provides permitting services. Building sizes are typically around 5,000 sq. ft. and site sizes range from less than an acre to three acres.

Confidential Conveyor Corridor

Posted on September 15th, 2020 by Renee Narvaez

A new leach pad is being developed to meet the needs of a new pit. A major earthwork project was undertaken to link the existing conveyor system to the new leach pad. As part of this project, Bowman provided temporary traffic control and temporary road designs as well as engineered drawings, specifications, construction scopes of work, and bid packages for the earthwork and new traffic underpass.

Classic & Fine Arts Academy (CAFA)

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its full scope planning, professional design, and construction management services to support the development of a charter school. The project required complex design aspects to accommodate the main facility and its ancillary support buildings and areas. The team also coordinated with local authorities for the expansion of public road and utility infrastructure to connect to the project.

Cadiz to Hopedale Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning and surveying services to design a complex extension of multiple large pipelines. The project was further challenged by sensitive environmental areas, tight easements, existing infrastructure, and ongoing mining activities.