Broadway Water Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided major upgrades to the Town of Broadway’s Water Treatment Plant. The upgrades included the installation of a state of the art 1.8MGD Pall Corp. MF membrane treatment system in a new concrete filtration building, upgraded and automated chemical feed systems, a 100,000-gallon well storage tank, and a 350,000-gallon finished water clear well.

Catlett – Calverton Wastewater System

Posted on September 15th, 2020 by Renee Narvaez

Bowman partnered with English Construction for this Design-Build project for a central wastewater collection, treatment and disposal system to serve the service districts of Catlett and Calverton. The project includes a new collection system consisting of individual Septic Tank Effluent Pump (STEP) systems that transfer wastewater to a 80,000 gpd central wastewater treatment plant utilizing an Integrated Fixed Film Activated Sludge (FAS) technology. Effluent will be disposed of through the use of subsurface drip irrigation drain fields.

Bordetown Waterfront Community

Posted on September 15th, 2020 by editor@bowman

Bowman provided civil engineering, landscape architecture and surveying services for the second phase of this large redevelopment project consisting of multi-family housing with 157 townhouses and 176 apartment units, and an amphitheater and shade structure overlooking the Delaware River.

Canton Car Wash

Posted on September 15th, 2020 by Jillian Taylor

Bowman provided surveying, land planning, and engineering services. Given the unique nature of this car wash project it required an analysis of both automobile and pedestrian circulation patterns within the site to ensure safety of users and the public. This project took a highly visible, dilapidated and under-utilized piece of industrial real estate and transformed it into an attractive “green” commercial site.

Cedar Crest Village

Posted on September 15th, 2020 by Suede

The project included the development of a retirement village with 1,500 independent living units and 512 assisted living and extended skilled care units located within 16 buildings on 232 acres.

Calumet

Posted on September 15th, 2020 by editor@bowman

Bowman team designed and planned a 900 plus unit residential subdivision as well as public road and utility infrastructure. The team was challenged with creating a site sensitive design while maximizing the total allowable dwelling units all while balancing community buy in with the town residence and adjacent neighbors.

Caliber Collision

Posted on September 15th, 2020 by editor@bowman

The Caliber Collision-Bowman relationship is a national program which covers four states. Bowman provides initial ALTA and design survey services for the development of new centers and engineering services including Special Use Permit preparation and processing, and planning document processing and approvals. Also prepares full construction documents.

BB&T

Posted on September 15th, 2020 by editor@bowman

Bowman was responsible for preparation of topographic survey, coordination with field crew, preparation of Special Use Permit (SUP) application and supporting documents including conceptual plans and exhibits for Plan Commission meeting and public hearing, preparation of construction documents including landscape plans, utilities coordination, coordination and obtainment of permit, and construction administration.

Bathtub Beach Specific Purpose Survey

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided multiple drone-based laser survey scans to analyze and monitor ongoing beach improvements. The team worked closely with FAA and local authorities for permitted exemptions to operate in prohibited drone areas.

Border Patrol Indoor Firing Range

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided surveying, civil engineering design, construction stakeout, and construction administration services for the U.S. Border Patrol station in Nogales, Arizona. The installation of the new modular facility included re-grading the existing site, delivering supporting water and sewer line extensions, and an expansion and repaving of the existing parking lot.