Calumet

Posted on September 15th, 2020 by Renee Narvaez

Bowman team designed and planned a 900 plus unit residential subdivision as well as public road and utility infrastructure. The team was challenged with creating a site sensitive design while maximizing the total allowable dwelling units all while balancing community buy in with the town residence and adjacent neighbors.

Cedar Crest Village

Posted on September 15th, 2020 by Renee Narvaez

The project included the development of a retirement village with 1,500 independent living units and 512 assisted living and extended skilled care units located within 16 buildings on 232 acres.

Cape Canaveral Air Force Station Fire Water Line Repair

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided site constriction survey and stakeout support for an active drilling operation consisted of four directional drill sites and approximately 9,300 LF of fire suppression transmission water line. The team was required to provide near real time analysis of alignments and adjust to various site conditions and client constraints.

Caldwell Park

Posted on September 15th, 2020 by Renee Narvaez

Caldwell Park is a 120-acre mixed-use development that includes 115 single-family lots, 131 townhomes and 286 apartments, along with 200,000 sq. ft. of commercial space. Bowman provided its core planning, surveying, and civil design serves to deliver the project. The team was challenged to incorporate elements of retail, office, multi-family, townhome, and single family uses in a tight and topographically constrained site.

Bruce Avenue Drainage Project

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided planning, surveying and design services to the City of Colonial Heights for the Phase III and IV drainage and utility improvement plans of the Bruce Avenue Drainage Improvements project. This project included approximately 6,500 linear feet of city streets. The scope of the project included complete water, sanitary sewer and storm sewer replacement. The project also involved substantial excavation of the roadways within the ROW limits and rebuilding of new asphalt sections and curb and gutter.

Caliber Collision

Posted on September 15th, 2020 by Renee Narvaez

The Caliber Collision-Bowman relationship is a national program which covers four states. Bowman provides initial ALTA and design survey services for the development of new centers and engineering services including Special Use Permit preparation and processing, and planning document processing and approvals. Also prepares full construction documents.

Cadiz to Hopedale Pipeline

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided its core planning and surveying services to design a complex extension of multiple large pipelines. The project was further challenged by sensitive environmental areas, tight easements, existing infrastructure, and ongoing mining activities.

Broadway Water Treatment Plant

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided major upgrades to the Town of Broadway’s Water Treatment Plant. The upgrades included the installation of a state of the art 1.8MGD Pall Corp. MF membrane treatment system in a new concrete filtration building, upgraded and automated chemical feed systems, a 100,000-gallon well storage tank, and a 350,000-gallon finished water clear well.

Catlett – Calverton Wastewater System

Posted on September 15th, 2020 by Renee Narvaez

Bowman partnered with English Construction for this Design-Build project for a central wastewater collection, treatment and disposal system to serve the service districts of Catlett and Calverton. The project includes a new collection system consisting of individual Septic Tank Effluent Pump (STEP) systems that transfer wastewater to a 80,000 gpd central wastewater treatment plant utilizing an Integrated Fixed Film Activated Sludge (FAS) technology. Effluent will be disposed of through the use of subsurface drip irrigation drain fields.

Bowen Solar Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a detailed topographic survey and preliminary engineering services to facilitate initial discussions with Calvert County officials and included a concept plan to illustrate the improvements relating to the proposed solar panels.