Explorer Pipeline Fauna Facility Upgrade

Posted on November 18th, 2023 by Jillian Taylor

The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.

American Castings Foundry Grounding Study

Posted on November 18th, 2023 by Jillian Taylor

Our team conducted a grounding study of the 13.8 kV Substation Area. An overall ground resistance report was developed and the limitations discussed. A new grounding plan with installation detail drawings for the upgraded ground grid required for new equipment installation was developed along with a grounding study report documenting findings and recommendations.

Energy Transfer Partners Ambia Compressor Station

Posted on November 17th, 2023 by Jillian Taylor

The project was initiated to upgrade the electrical system for the Ambia compressor station located in Ambia, IN. The facility has four gas-driven reciprocating compressors with ancillary motor loads, multiple building loads and a facility emergency generator.

Environmental Surveying & Subsurface Utility Services

Posted on November 16th, 2023 by Jillian Taylor

Our team has provided surveying and subsurface utility consultation services to the environmental sector throughout our years of business. With the continued importance of environmental compliance our services have expanded throughout New Mexico and surrounding states.

Janet Kahn School of Integrated Arts

Posted on November 16th, 2023 by Jillian Taylor

To support the design and construction of a new facility and the required utility infrastructure, our surveying and subsurface utility departments worked in conjunction to designate, survey and map existing utility conditions to support planning and design phases.

US 54 Roadway Improvement

Posted on November 16th, 2023 by Jillian Taylor

Our team provided subsurface utility engineering (quality level ‘A’, ‘B’ and ‘D’) services to support future planning and roadway design improvements along US 54 in Carrizozo, NM.

Checkers Restaurant Vehicle Queuing Study

Posted on October 24th, 2023 by Jillian Taylor

Our firm conducted a field observation/evaluation of the physical and operational characteristics of the vehicle queue lanes at an existing Checkers facility in the South Jersey area.

Running Brook Road Improvement Project

Posted on October 24th, 2023 by Jillian Taylor

As prime consultant, we led a team providing survey, design, bidding support, construction management and inspection of the entire 1-mile length of Running Brook Road. The resurfacing of the entire lengths of two adjacent side streets, Heath Drive and Compton Way, an additional 0.3 miles, were added to the project scope during the design phase.

Long Beach Blvd. Improvement Project

Posted on October 23rd, 2023 by Jillian Taylor

Our team provided construction management, inspection, and labor compliance for the resurfacing of 192,779 sq. ft. of roadway in Lynwood, CA. Other activities included renovating sidewalks, driveway approaches, curbs and gutters and constructing six new bus pads.

Montebello Blvd. Complete Street Project

Posted on October 19th, 2023 by Jillian Taylor

The scope of work under Phase II of the Montebello Boulevard Bike Lane and Sidewalk Improvement project included design, preparation of PS&E for roadway improvements and widening, pavement rehabilitation, concrete improvements, sidewalk improvement, utility adjustments, ADA improvements, Class II bike lane, traffic signal improvements and pedestrian lighting