I-78 Krumsville Interchange ITS

Posted on December 30th, 2023 by Renee Narvaez

Our team prepared ITS plans for the installation of two DMS and removal, temporary replacement, and relocation of one CCTV Camera, one HAR flashing beacon sign, and one HAR Transmitter. We also completed partial interchange lighting design for the new interchange. 

SR 0061 Pottsville Pike and Tuckerton Road

Posted on December 29th, 2023 by Renee Narvaez

The project started with preliminary engineering for PennDOT District 5-0 in 2010. There were several phases of the project in engineering, including an alternatives analysis, preliminary engineering, environmental clearance, and final design prior to the project advancing into construction.

SR 0415 Memorial Highway, Dallas 5-leg Intersection

Posted on December 28th, 2023 by Renee Narvaez

Our firm was retained by PennDOT for the preliminary engineering and final design of the $3.5M “Dallas 5-Leg” intersection improvement project. This project was identified as a “high priority” project in the Back Mountain Area Council of Government’s Transportation Plan.

Cross Country Elementary and Middle School

Posted on December 15th, 2023 by editor@bowman

Bowman was responsible for the MEP engineering for the new 95,000 sq. ft. state-of-the-art Elementary and Middle School. The new school will have three floors, equipped with cutting-edge science, art and music labs, even several mindfulness and communal spaces. The project was designed to achieve LEED Gold certification.

Kirk Road Reconstruction and Utility Relocation

Posted on December 12th, 2023 by Renee Narvaez

Our team is currently preparing roadway design plans for the reconstruction of an 0.8-mile roadway segment on Kirk Road, from Summit Boulevard to Gun Club Road, in Unincorporated Palm Beach County.

Challenger Boulevard at Winkler Avenue Project

Posted on December 12th, 2023 by Renee Narvaez

Since 2003, our firm has been a transportation consultant to the City of Fort Myers on multiple, consecutive contracts that have precipitated numerous design, planning, and traffic engineering projects. Our team has carried the Challenger Boulevard at Winkler Avenue project from study/conception to final design.

NW 31st Avenue Roadway Reconstruction LAP/JPA Project

Posted on December 12th, 2023 by Renee Narvaez

Our team prepared design plans for a half-mile segment of NW 31st Avenue, from NW 39th Street to NW 44th Street. The City initiated this LAP/JPA (Joint Permit Application) project to implement complete streets, particularly to provide sidewalk along the east side, providing safer pedestrian access to transit stops.

Annual Services Traffic Signal Design

Posted on December 12th, 2023 by Renee Narvaez

Our team completed multiple tasks on a Continuing Service Traffic Signal Design Contract with the Palm Beach County Traffic Division. Assignments included a school zone LAP project and preparation of traffic signal installation plans for multiple county intersections.

University of New Mexico Hospital

Posted on December 8th, 2023 by Renee Narvaez

Our team was hired by UNMH to determine existing conditions within the proposed project limits. UAV-based imagery was generated for the immediate site and surrounding area comprised of approximately 143 acres of UNM North Campus.

Burlington North Santa Fe Railroad

Posted on December 8th, 2023 by Renee Narvaez

Our team recently completed surveying and mapping of a large portion of the BNSF site in Belen, NM. The purpose of the survey was to determine existing conditions for several different future improvements contemplated at that facility.