Westgate Elementary School

Posted on October 25th, 2021 by Suede

Bowman completed the design for the MEP engineering design for the renovation of the 42,000 sq. ft. addition to Westgate Elementary School located in Falls Church, Virginia. Since the facility almost doubled in size, the mechanical, plumbing, and electrical systems were upgraded to provide the required services.

Ernst & Young

Posted on October 25th, 2021 by editor@bowman

Our team was selected to provide mechanical, electrical, and plumbing engineering services for the new 120,000 sq. ft. Ernst and Young McLean offices and conference center.
The project involves the design and construction administration for five floors of corporate office space.

Capital One Block A

Posted on October 20th, 2021 by Renee Narvaez

Bowman is providing MEP engineering design for the 31-story, 729,000 sq. ft. class A, corporate headquarters building in Tyson’s Corner, Virginia. The building features 68,000 sq. ft. of retail space in addition to a 495,000 sq. ft. office. Parking includes eight levels of above grade and four levels below grade.

Royal Farms Convenience Stores

Posted on October 19th, 2021 by editor@bowman

Bowman has been contracted by Royal Farms in providing site/civil engineering for the construction of new convenience stores and gas stations located across Virginia. Bowman has provided due diligence and site layout and design for each of the stores.

Dominion Energy Critical Transmission Substation Security Plan

Posted on November 30th, 2020 by editor@bowman

Bowman provided state-of-the-art 3D laser scanning services for Dominion Energy’s $500 million Critical Transmission Substation Security Plan program.

Moseby Drive

Posted on October 27th, 2020 by Renee Narvaez

A dual culvert under Moseby Drive in the City of Manassas Park, Virginia became compromised during a storm and collapsed. As a result, a townhouse community of over 400 residents became inaccessible to vehicle traffic and also severed the water and sanitary utilities. Bowman was called upon by the City to lead efforts to restore the vital connection.

Tuscarora High School

Posted on September 29th, 2020 by editor@bowman

Bowman provided engineering, environmental consulting, project review and oversight during the construction of the high school, infrastructure, and stream restoration project.

Northern Virginia Data Center Phases I-III

Posted on September 29th, 2020 by editor@bowman

Bowman provided a feasibility study and a layout for the preliminary site, extensive topographic survey, floodplain study and alteration, as-built survey, preliminary earthwork analysis, final site design/permitting, utility coordination construction administration services as well as construction stake-out and final as-built surveys.

Dulles International Park – Phases I-II

Posted on September 29th, 2020 by editor@bowman

Bowman provided preliminary site layout and due diligence, as-built survey, preliminary earthwork analysis, final site design/permitting, construction administration services, construction stake-out, and final as-built survey for project closeout.

United States Holocaust Memorial Museum

Posted on September 28th, 2020 by editor@bowman

Bowman performed 3D scanning and recordation to establish a system of measuring, documenting and monitoring surface loss, cracking, efflorescent growth, and alignment changes over time on the exterior surfaces of the limestone facades.