Loudoun Valley Estates
Bowman was retained to conduct planning, civil engineering and surveying services for this new urban community located along the Dulles Greenway west of Dulles International Airport.
Bowman was retained to conduct planning, civil engineering and surveying services for this new urban community located along the Dulles Greenway west of Dulles International Airport.
Bowman provided planning and civil design services to deliver this 12-acre residential redevelopment consisting of twelve, three-story buildings, providing a total of 165 residential units of with a portion allocated for affordable housing. Bowman was responsible for all preliminary and final site plans, prepared a boundary and topographic survey, and conducted a traffic impact study.
Bowman provided extensive planning and surveying services to the analysis and design of a power plant expansion. The project consisted of surveying services for a railroad site located approximately one mile north of Lee Steam Plant, near the Dunlap Road grade crossing.
Project was to install a new 10″ pipeline carrying Ethane from the Houston Plant to a point just south of the Ohio River located at the NOVA Chemicals property. This project was originally designed by two different consultants. Bowman was brought in to provide the civil engineering component.
The I-66 “Outside the Beltway” project is a public-private partnership transportation project that includes 22.5 miles of new tolled express lanes, new and improved bus service and transit routes, and new and expanded park and ride lots.
Bowman provided full service engineering, environmental, surveying and construction administration for the restoration of 800 lf of degraded stream valley, installation of 1,000 lf of new trails, and a 30 foot long pedestrian bridge crossing, as well as the first two synthetic turf fields in Tysons Virginia.
Bowman provided its core services including planning, layout, surveying, design and coordination, permitting, bidding and construction observation for this 4-acre YMCA facility. In addition, Bowman was tasked with the coordination of all approvals, permitting and platting with the City of Hutto, Williamson County, and the Texas Commission of Environmental Quality (TCEQ).
Bowman provided planning, surveying and civil design services including topographic and route surveys, land records research, easement and right-of-way acquisitions, tree inventory/analysis/management and supplemental landscape plans. Also provided conceptual design development, final construction drawing preparation, cost estimating, bid phase services, construction administration, construction stakeout, as-built surveys and close out reporting.
Bowman provided surveying and platting, civil engineering, traffic signal design, rezoning, public participation, construction plan approvals, and construction administration for an upscale, urban village style, 55+ age single-family neighborhood, community park, extensive landscaping, and amenities. Bowman also facilitated a solution to provide extensive planning and hardscape design amidst existing easements associated with prior roadway plans.
Bowman provided professional engineering and surveying services including preliminary design, site control, utility system layout, site and lot grading, stormwater facility design, preparation of subdivision construction plans and final plats, and construction phase services for this 287-acre commercial and residential development. Bowman also prepared and obtained an Edwards Aquifer Contributing Zone Permit through the Texas Commission on Environmental Quality.