Rockcliff Energy Saltwater Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman partnered with Rockcliff Energy to conduct a preliminary survey and perform construction staking for an 88-mile saltwater gathering system. This system, designed to enhance the efficiency of saltwater disposal in midstream operations, aimed to eliminate the dependence on conventional 18-wheeler disposal methods.

Preliminary Survey for Natural Gas Gathering System

Posted on February 28th, 2024 by Jillian Taylor

Bowman secured a contract to conduct a preliminary survey for a 55-mile gas gathering pipeline, which is designed to gather natural gas from several well locations and transports it to a liquefied natural gas (LNG) plant in Southwest Louisiana.

Pipeline Integrity Support

Posted on February 28th, 2024 by Jillian Taylor

Bowman was contracted to provide integrity support services for 41 miles of pipeline across East Texas and Northwest Louisiana. To ensure the reliability and safety of the energy infrastructure, our team conducted depth of cover surveys to assess the position of pipelines beneath the surface.

Gas Gathering Collection System Survey

Posted on February 28th, 2024 by Jillian Taylor

Bowman was engaged to provide open ditch as-built surveys for 315 miles of natural gas gathering systems. Bowman not only provided an accurate representation of the existing infrastructure but also served as a valuable resource for future maintenance, expansion and regulatory compliance.

Unloading Facility & Metering Station

Posted on November 29th, 2023 by Jillian Taylor

JP Energy Partners planned a crude oil gathering, storage and mainline pump facility located south of Cherokee, OK and a crude oil pipeline metering station at Cushing, OK to serve the new Great Salt Plains 8” Crude Pipeline originating in Cherokee, OK and terminating in Cushing, OK.

Velocity Midstream – SCOOP Engineering Review

Posted on November 28th, 2023 by Jillian Taylor

Our team was contracted to carry out a comprehensive electrical engineering review of documentation and drawings provided by the client for the South Central Oklahoma Oil Pipeline (SCOOP) Project that was under construction in south-central Oklahoma.

Holly Frontier Corporation West HVGO Tank 188

Posted on November 28th, 2023 by Jillian Taylor

Holly Frontier’s Truck Loading project in Tulsa, OK implemented an additional means of removing heavy gas oils (HVGO) from storage tank 188 in order to supplement the existing piping discharge.

Explorer Pipeline Fauna Facility Upgrade

Posted on November 18th, 2023 by Jillian Taylor

The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.

Brazos County Lease Units

Posted on August 30th, 2022 by Jillian Taylor

Our team completed the boundary survey of over 2,988 acres of land in Brazos County for the purpose of creating five new units for an upstream oil and gas company. Boundaries were unique in this area as they adjoined state highways, the Little Brazos River, and railroad right-of-way.

Carl Farley’s Boys Ranch

Posted on August 4th, 2022 by Jillian Taylor

Our team was contracted in March 2015 by an attorney representing the Cal Farley’s Boys Ranch in remote Oldham County, Texas. Our role was to serve as an expert consultant concerning a contested area with substantial oil and gas royalty implications. The project consisted of research and sketching, field surveying, computation, and communicating our findings to the client.