Live Data Center Upgrades

Posted on August 15th, 2025 by Angelique

As part of an ongoing five-year partnership, our team provided data center and critical operations consulting, serving as a liaison between the client’s real estate team, IT operations group and third-party facility operators. We conducted reliability and risk reviews, evaluated both capital and operational expenditures and delivered designs that enhanced reliability and operational efficiency.

AI Data Centers

Posted on August 15th, 2025 by Angelique

While many companies are just now entering the AI data center space, our team has been there since the beginning, adapting data center design as the industry has evolved. Our team works with third-party providers, co-location owners, enterprise users, AI companies, developers, and all sorts of entities requiring AI data center services.

Live Data Center Infrastructure Upgrades

Posted on August 14th, 2025 by Angelique

Our team provided program and project management along with electrical, mechanical, plumbing and fire protection engineering services for this this confidential health insurance client, implementing a 2015 master plan for a strategic series of upgrades needed to maintain the data center’s resiliency.

Cross Country Elementary and Middle School

Posted on December 15th, 2023 by Renee Narvaez

Bowman was responsible for the MEP engineering for the new 95,000 sq. ft. state-of-the-art Elementary and Middle School. The new school will have three floors, equipped with cutting-edge science, art and music labs, even several mindfulness and communal spaces. The project was designed to achieve LEED Gold certification.

UMD BioPark 4MLK Building

Posted on December 7th, 2023 by Renee Narvaez

4MLK is the first of two new gateway buildings to be prominently located at the entrance of the research park. Bowman is responsible for the MEP design services for the first Gateway building, a 266,000 sq. ft. facility. The building is designed LEED Silver and exceeds ASHRAE 90.1-2010 by 20%.

Unloading Facility & Metering Station

Posted on November 29th, 2023 by Jillian Taylor

JP Energy Partners planned a crude oil gathering, storage and mainline pump facility located south of Cherokee, OK and a crude oil pipeline metering station at Cushing, OK to serve the new Great Salt Plains 8” Crude Pipeline originating in Cherokee, OK and terminating in Cushing, OK.

Velocity Midstream – SCOOP Engineering Review

Posted on November 28th, 2023 by Jillian Taylor

Our team was contracted to carry out a comprehensive electrical engineering review of documentation and drawings provided by the client for the South Central Oklahoma Oil Pipeline (SCOOP) Project that was under construction in south-central Oklahoma.

Holly Frontier Corporation West HVGO Tank 188

Posted on November 28th, 2023 by Jillian Taylor

Holly Frontier’s Truck Loading project in Tulsa, OK implemented an additional means of removing heavy gas oils (HVGO) from storage tank 188 in order to supplement the existing piping discharge.

Explorer Pipeline Fauna Facility Upgrade

Posted on November 18th, 2023 by Jillian Taylor

The Fauna Facility Upgrade Project in Houston, Texas consisted of two phases, both of which centered on optimizing the tank to mainline flow. Phase I installed new piping from an existing surge relief system to the suction side of two existing mainline units. A new turbine meter, small volume prover, and new piping were installed downstream of the two existing mainline units.

American Castings Foundry Grounding Study

Posted on November 18th, 2023 by Jillian Taylor

Our team conducted a grounding study of the 13.8 kV Substation Area. An overall ground resistance report was developed and the limitations discussed. A new grounding plan with installation detail drawings for the upgraded ground grid required for new equipment installation was developed along with a grounding study report documenting findings and recommendations.