East Edisto

Posted on September 15th, 2020 by editor@bowman

Bowman provided a full scope of planning, surveying, and civil design services for this 80,000-acre multi-decade development project. They team worked closely with the county officials to help craft form-based code to incorporate smart growth, led survey teams, designed residential site and infrastructure plans.

Ellsworth Road

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided extensive planning, design, and construction support services to deliver a complicated expansion of major public infrastructure. The team worked closely with local residents, municipal bodies, and governing utility boards to ensure all stakeholders concerns were understood and addressed in the planning process.

FasTracks – RTD Eagle P3

Posted on September 15th, 2020 by Renee Narvaez

This project consists of 33 miles of EMU Commuter Rail connecting downtown Denver Union Station to the Denver International Airport on the East Line and to the vicinity of Ward Road, northwest Denver, unincorporated Adams County, Arvada and Wheat Ridge. This project also included a Commuter Rail Maintenance Facility.

Discovery Elementary School

Posted on September 15th, 2020 by editor@bowman

Bowman provided civil engineering, surveying, scanning, and construction administration services to support this new 98,000 sq. ft. elementary school on 25 acres.

Crosspoint

Posted on September 15th, 2020 by Suede

Bowman was hired to ensure design compliance with previously designed but never constructed plans and coordinate tie-in and access to public infrastructure. In the process, the team optimized the layout to reduce grading requirements and provide a cost savings to the client.

Cople Elementary School Solar Project

Posted on September 15th, 2020 by Renee Narvaez

5-acre 2,100 solar panel array located on existing Elementary School property produces 1.2 megawatts a year, offset-ting the facilities carbon footprint by 865 tons of CO2. This project is part of a Power Purchase Agreement with Sun-Tribe Solar which resulted in no investment from the County and estimated to save $3.6 million over the solar array’s lifespan. Bowman provided comprehensive engineering and surveying services.

Confidential Wash Settlers

Posted on September 15th, 2020 by editor@bowman

Bowman, having previously designed the original settlers during another project, designed two new Wash Settlers with related structures, containment, equipment, storage, piping and instrumentation.

Culver’s

Posted on September 15th, 2020 by editor@bowman

Bowman currently works with Culver’s to help expand their footprint in Florida and throughout the Southeast market. Bowman’s retail experts work closely with the owners to provide conceptual site planning, site development plans, civil construction documents, site entitlement, permitting and construction management.

Dominion Power

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided topographic, physical and boundary surveying services, as well as civil engineering services including grading, drainage, and erosion & sediment control. The team was challenged to design with existing drainage problems in an area prone to flooding.

Desert Wind Farm

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided a variety of survey services to support the development of a proposed 150 turbine, 330-megawatt wind farm. The team was responsible for preparing and recertification for ALTA surveys and pos construction as-builts.