Chico’s

Posted on September 26th, 2023 by Jillian Taylor

Bowman continues to serve Chico’s as their Site Development Engineer as they aggressively grow and expand. The original 27-acre site served the corporation for design, research, marketing and other administrative functions.

The Chesterfield Building – West Village

Posted on July 6th, 2023 by Amy Talton

Bowman provided mechanical, electrical, and plumbing engineering design and energy modeling services for the complete gut and renovation of a historic tobacco factory and warehouse into a LEED Gold certified seven-story, 314,000 sq. ft. office and technology center.

Baltimore Ravens Under Armour Performance Center

Posted on July 6th, 2023 by Amy Talton

Bowman provided mechanical, electrical and plumbing design engineering for the interior renovation of the 113,237 sq. ft. training facility, as well as a 46,000 sq. ft., two-story addition to the Baltimore Raven’s Under Armour Performance Center.

6100 Meriweather Office Building & Parking Garage

Posted on July 5th, 2023 by Amy Talton

The project consisted of the MEP engineering and commissioning for a 300,000 sq. ft. core and shell office building and an above ground parking garage with a capacity of approximately 1,400 vehicles and 30 Level 2 EV charging stations. The garage design included a two-bay fire station for Howard County Fire and Rescue.

Pike and Rose Block 3

Posted on July 5th, 2023 by Amy Talton

Bowman was responsible for the mechanical, electrical and plumbing design for the new 253,000 sq. ft., 10-story LEED Gold certified office building and seven-story parking garage located on Block 3 of the Pike and Rose development in Rockville, Maryland. The building includes 7,000 sq. ft. of shell retail space, a fitness center and conference center.

Internap Colocation Facility

Posted on June 23rd, 2023 by Jillian Taylor

Our team performed fire protection engineering and life safety design, as well as construction period services, as part of the design team. Phase I of the data center’s expansion included converting approximately 17,000 sq. ft. of existing office space in downtown Atlanta to a data center with associated support areas. Per the Internap basis of design, the data center was protected by a preaction sprinkler system.

Jones Hall-Houston Symphony

Posted on April 14th, 2023 by Renee Narvaez

Documented every cubic inch of the home of the Houston Symphony. The building is a massive structure spanning an entire city block. Our team laser scanned and modeled from the center stage to the marble-clad exterior, down to the mechanical room. The scope also included scanning harness-only areas directly above the stage.

Historic Hotel

Posted on April 14th, 2023 by Jillian Taylor

Our laser scanning team was deployed to the project site to begin the meticulous work of measuring the gutted building, inside and out, with accuracy within”. The crew was working while the building was in the middle of demolition, and the project involved four phases of scanning to work around the other contractors.

North Park Senior Housing

Posted on January 12th, 2023 by editor@bowman

The project includes 76 affordable senior apartments and eight permanent supportive housing studios for formerly homeless seniors. The overall project includes 194 total units with 118 market rate units. The complex is sustainable, transit- oriented and mixed-income friendly. Our team of landscape architects provided specialized design for this underserved demographic with street level, podium and roof top landscapes.

County of San Diego Firearms Training Center

Posted on January 12th, 2023 by editor@bowman

Provided professional landscape architecture services for the County of San Diego Sheriff’s Firearms Training Center. Located in Otay Mesa, the Sheriff’s Firearms Training Center provides training and qualifications for our local police, sheriffs, CIA and FBI agents.