Parker’s Kitchen

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided site, utility, drainage and stormwater design, as well as rezoning and full permitting services for new ground-up sites in the Charleston SC market. Permitting was conducted with applicable Local, State and Federal agencies. The stores are approx. 5,000 sq. ft. and sites range from 3-6 acres.

Portsmouth Bypass

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided overall design, design management, roadway and drainage design, hydrologic and hydraulic calculations, traffic engineering/management, electrical design, ITS, tolling systems, right-of-way and ATCs through Tender Phase.

Pohick Stream Valley Trail

Posted on September 15th, 2020 by Renee Narvaez

Bowman has provided site engineering design, environmental reconnaissance and permitting, and topographic survey for the construction of five, 80 foot long, fair weather stream crossing structures, and 1,300 lf of new trail construction and rehabilitation of existing trail.

Middlesex Regional Water System

Posted on September 15th, 2020 by Renee Narvaez

Bowman is assisting the Middlesex Water Authority with developing a regional water system in lower Middlesex County. Due to poor groundwater quality in the individual shallow wells throughout the eastern portion of the County, the MWA has sought to develop a regional water system to serve the entire eastern section of the County. This effort […]

Nelson County Service Authority

Posted on September 15th, 2020 by Renee Narvaez

Bowman currently holds an Annual Engineering Agreement for civil, water/wastewater and surveying services with the Nelson County Service Authority.

Middlesex Water Authority Sewage Collection System

Posted on September 15th, 2020 by Renee Narvaez

Bowman is assisting the Middlesex Water Authority with developing a regional water system in lower Middlesex County. Bowman has completed this evaluation, developed and obtained approval of the Preliminary Engineering Report and has begun design to follow Hampton Roads Planning District Commission specifications. The scope involves the installation of approximately 42 miles of water distribu-tion piping sized from 12” down to 2″.

Metra/US Route 45 Bridge

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided Phase II engineering design of a two-span steel through girder railroad bridge. The project included modifications to the geometry and configuration of the Metra Southwest Service Line Bridge including raising the bridge profile. The scope of services included the removal and replacement of the railroad bridge over US 45 and a separate pedestrian […]

Maryland Live! Casino

Posted on September 15th, 2020 by Renee Narvaez

The project included a 200,000 sq. ft. casino with restaurants and a venue for live entertainment, a parking garage, and surface parking on approximately 12 acres of the Arundel Mills Development.

Metro West

Posted on September 15th, 2020 by Renee Narvaez

The team designed a transient-oriented, mixed-use community South of the Vienna-Fairfax Metro Station and north of Route 29 that incorporates a variety of townhomes, condominiums, apartments, convenience retail, commercial office, daycare and public spaces.

Metropolitan Park 6

Posted on September 15th, 2020 by Renee Narvaez

Bowman provided full engineering and surveying support for the project from conceptual design to final construction documents for this mixed-use residential project.