Northeastern University

Posted on August 15th, 2025 by Angelique

As part of a long-standing relationship with Northeastern University, our team provided electrical engineering services for a Combined Heat and Power (CHP) microgrid project. The initiative was focused on increasing reliability and resiliency, establishing a new Central Utility Plant (CUP), consolidating campus electric utility services and creating a modern, campus-wide microgrid.

Mass General Brigham

Posted on August 15th, 2025 by Angelique

Serving as the owner’s IT project manager, our team acts as the eyes and ears of Mass General Brigham’s internal IT and engineering divisions on a new clinical facility for Massachusetts General Hospital. The team ensures that all low voltage infrastructure is properly designed and fully coordinated across disciplines to support this mission critical healthcare environment.

Office Building Engineering Management

Posted on August 15th, 2025 by Angelique

Our team was engaged directly by a confidential financial services client to serve as the engineer of record for tenant improvement design and construction administration in a new four-story office building. Services included mechanical, lighting, power, fire alarm and fire protection design. In collaboration with the owner, developer, core-shell design team and the project’s architect and interior designer, the team provided Engineering Management Services (EMS) during the core-shell design phase.

Standalone Battery Energy Storage System

Posted on September 19th, 2024 by Renee Narvaez

Bowman was selected to provide civil and structural engineering services for the first standalone battery energy storage system (BESS) in California. Our scope of work included delivering detailed engineering at 30%, 60%, 90% and issue for construction (IFC) stages, ensuring complete compliance with the client’s scope and California’s regulatory requirements. Structural engineering services included a […]

Combined Solar & BESS Development

Posted on September 19th, 2024 by Renee Narvaez

Bowman was contracted to provide civil and structural engineering services for the first combined solar and battery energy storage system (BESS) development in Colorado. The project involved a multi-phase approach where Bowman delivered 30%, 60%, 90% and issue for construction (IFC) plan sets in accordance with the client’s scope of work and all applicable regulatory […]

Wadesboro 5 MW Solar PV System

Posted on March 31st, 2023 by Renee Narvaez

Our team served as the electrical, civil, and structural engineer for the Wadesboro Solar project. We also acted as the design project manager, working closely with the developer, installer and equipment manufacturers to efficiently execute the design of this 5 MW AC (7.65 MW DC) solar PV system located in Wadesboro, NC.

Spencer Meadow Solar and Lowe Country Solar

Posted on March 31st, 2023 by Renee Narvaez

Spencer Meadow Solar and Lowe Country Solar (Spencer & Lowe) are a pair of twin projects near Asheboro, NC. Our team provided the electrical and structural engineering, a comprehensive plan set and construction support.

Edenton Solar

Posted on March 30th, 2023 by Renee Narvaez

This project was located on the coast in harsh and wet environmental conditions near the North Carolina Albermarle Sound. Our team provided the full electrical design (PV system, auxiliary power, medium voltage design) and the structural design (inverter group structures, equipment pads).

School District Solar Deployments

Posted on March 29th, 2023 by Renee Narvaez

Our team worked with a local utility company, Delta Montrose Electric Association (DMEA) to design 10 kW grid connected PV systems for several local schools. In addition to providing modest energy offset, these solar electric systems serve as educational and demonstration systems at five high schools located in Delta and Montrose counties.

Bedford Solar

Posted on March 29th, 2023 by Renee Narvaez

Our engineering team worked closely with the racking manufacturer and civil engineer to optimize the site for installation and system performance. The layout takes advantage of the slight southern facing slope of the parcel, while varied east to west spacing and backtracking reduces inter-row shading on the rolling terrain.